Control of the Smartline Pump 1000
9
Rear Panel View of the Smartline Pump 1000
5.6 5.5 5.7 5.4 5.8 5.3 5.2 5.1
Fig. 5
Rear Panel of the Smartline Pump 1000
5
Rear panel elements
5.1 ON/OFF
switch
5.5 RS-232
interfaces
5.2 Power
connector
5.6 EVENT terminal strip
connections
5.3 Serial
number
5.7 REMOTE terminal strip
connections
5.4 Socket for optional connection
with Smartline Manager 5000 5.8 Ventilator
Connection to Main Power
The Smartline Pump 1000 is equipped with a universal power supply for
input voltages ranging from 90 to 260 Volts AC. Manually switching the
supply voltage is not required.
Make sure that the main power supply is properly grounded and that
an appropriate three-pronged power cable is used. Connecting the
pump to a faulty power socket can cause damage to the instrument.
Connect the power cable to the socket on the rear of the instrument, and
switch on the device with the ON/OFF key (see items {5.1} and {5.2} in
Fig. 5
Control of the Smartline Pump 1000
Basics for operating the Smartline Pump 1000
Power On and Selftest
Upon powering up the instrument the display will present the text
“Smartline PUMP 1000” and the software version, e.g. “VERSION 1.0X”
or higher. The instrument performs a self test, including firmware
validation and tests of the RAM memory and motor unit. After completion
of this routine, the message “SYSTEMTEST OK” indicates that the pump
is ready for operation and the ID of the last active program is displayed.
To avoid damage to the pump head and pump head seals, never run
the Smartline Pump 1000 without eluent in the pump head as well as
in the piston backflushing compartment. To set up the piston