BOV
SPOOL
REASSEMBLY
1.
Lubricate
the
O
‐
ring
channels
for
the
3
spool
O
‐
rings
(18)
,
in
the
metal
spool
(16)
(Fig.
10)
.
Then
install
the
four
O
‐
rings
(18,
24,
25,
29)
.
NOTE:
Using
a
syringe
simpli
fi
es
this
task
and
reduces
waste.
Lubrica ng
the
3
spool
O
‐
ring
grooves
directly
also
improves
SPOOL
(16)
rota onal
movement.
2.
Lightly
lubricate
the
internal
walls
of
the
BOV
housing
(1)
.
3.
Being
careful
not
to
pinch
any
O
‐
rings,
press
the
spool
(16)
into
the
BOV
housing
(1)
(Fig.
11)
.
NOTE:
Ensure
that
the
holes
for
the
installa on
of
the
LEVER
(34)
are
aligned
when
installing
the
SPOOL
(16).
4.
Holding
the
lever
screw
(33)
in
one
hand,
place
the
O
‐
ring
(35)
in
the
groove
as
shown
(Fig.
12)
.
5.
Hold
the
lever
(34)
in
place,
and
start
the
lever
screw
(33)
by
hand
clockwise.
Then
con nue
ghtening
the
lever
screw
(33)
with
a
5/32"
L
‐
shaped
Allen
key
(Fig.
13)
.
DO
NOT
over
‐
ghten.
NOTE:
Be
careful
not
to
damage
the
sealing
surface
of
the
INNER
SPOOL
(16)
and
BOV
HOUSING
(1).
NOTE:
If
replacing
the
MUSHROOM
VALVES
(26),
ensure
not
to
place
damaging
stress
on
the
VALVE
HOLDERS
(22,
23).
Figure 10
Figure 11
Figure 12
Figure 13
Содержание ORCA SPIRIT
Страница 4: ...4 MSL 72 161 Jetsam Orca Spirit manual R 5 Photo s by Jim Abernethy and Doug Ebersole...
Страница 21: ...21 MSL 72 161 Jetsam Orca Spirit manual R 5...
Страница 25: ...25 MSL 72 161 Jetsam Orca Spirit manual R 5...
Страница 124: ...KISS Rebreather LLC www kissrebreathers com info kissrebreathers com...