www.kissrebreathers.com
email:
phone: 1 479 739 7726
Training Checklist-CCR Deco Diver R.0 NSF 64.177
2
____ Bail out second stage: Use to add diluent gas to the loop
____ Dual button MAV: Adding diluent gas (if unit is shipped with this item)
6.
Emergency procedures: demonstrate appropriate response to the following; each dive should have a
minimum of 2, ”diver emergencies” that the student must react to: Average score: ____
____ Practical bailout skills: including 2 open circuit ascent’s from approximately 18
meters/59 feet
____ Gas shut downs and loss of gas
____ Broken hoses
____ Flooded absorbent canister
____ Carbon dioxide (CO2) breakthrough
____ Low oxygen drills
____ High oxygen drills
____ Flooding loop
____ Electronics, sensor, and battery failure
7.
Practice transferring to open circuit bailout: Score: ____
8.
Rescue skill session as outlined by Training Agency: Score: ____
9.
Use of buoyancy control system: Average score: ____
____ Buoyancy and trim control at safety stop
____ Buoyancy and trim control during dive
10.
Controlling and monitoring for PPO2 levels: Average score: ____
____ Raising/lowering PPO2
____ Starting PPO2
____ PPO2 monitoring every minute
____ Manual Add Valve verification: static at constant depth, monitor change over several minutes
____ Electronics systems monitoring for PPO2 levels (SETPOINT) and setpoint switching using manual and
pre-programmed methods when available (when the unit is equipped with an on board
decompression computer that monitors sensors)
11.
Electronic systems use: Average score: ____
____ Use and adjustment of Heads Up Display, position, brightness, colour
____ Use and adjustment of PPO2/depth/time display, position, brightness, colour
____ Use and adjustment of decompression computer, set up/gas switching, battery verification, etc
12.
Use of lift bag/DSMB and reel (where relevant and applicable): Score: ____
13.
Mask removal and replacement: Score: ____
14.
Proper execution of the dive within all pre-determined dive limits: Score: ____
15.
Demonstration of safety stops at pre-determined depths (on all dives): Score: ____
16.
Constant loop volume management: Score: ____
17.
Cell validation checks with appropriate use of diluent and oxygen: Average score: ____
____ Oxygen sensor verification at depth
____ Linearity check of sensors at approximately 5 meter/16 feet on pure oxygen
Содержание ORCA SPIRIT
Страница 4: ...4 MSL 72 161 Jetsam Orca Spirit manual R 5 Photo s by Jim Abernethy and Doug Ebersole...
Страница 21: ...21 MSL 72 161 Jetsam Orca Spirit manual R 5...
Страница 25: ...25 MSL 72 161 Jetsam Orca Spirit manual R 5...
Страница 124: ...KISS Rebreather LLC www kissrebreathers com info kissrebreathers com...