Keysight N5224B/25B Service Guide 4-9
Troubleshooting
Power Up Troubleshooting
Power Up Troubleshooting
Check your network analyzer for evidence that it is powering up correctly.
Perform the following steps and make sure that the analyzer is displaying
correct behavior as noted in the following steps.
Step 1.
Disconnect all peripherals and plug in the network analyzer. Before the
analyzer is powered on, the line switch should glow yellow and no other
lights should be on.
Step 2.
Turn on the network analyzer.
— The line switch should glow green.
— The fans should be audible.
— The display should flash and then show the hardware boot-up sequence.
This process checks the RAM and communication with the solid state drive.
These checks return an error message if a problem is detected.
— The Windows operating system should start.
— The network analyzer measurement interface should open with an S
11
measurement displayed.
Step 3.
If the analyzer powers up correctly, continue troubleshooting with
Panel Troubleshooting” on page 4-17
.
Step 4.
If the analyzer does not power up correctly, follow these troubleshooting
steps:
— If the line switch does not glow, go to
“Power Supply Check” on page 4-10
— If you cannot hear the fans operating, go to
“If the Fans Are Not Operating”
— If the line switch displays a green light and the fans are operating (audible),
but the display remains dark, go to
— If the instrument appears to abort the network analyzer measurement
interface process, contact Keysight. Refer to
.
Immediately unplug the instrument from the ac power line if the unit
shows any of the following symptoms:
— Smoke, arcing, or unusual noise from inside the analyzer.
— A circuit breaker or fuse on the main ac power line opens.
Содержание N5224B
Страница 3: ...3...
Страница 4: ...4...
Страница 12: ...12 Keysight N5224B 25B Service Guide Contents...
Страница 84: ...3 52 Keysight N5224B 25B Service Guide Tests and Adjustments Adjustments 3...
Страница 145: ...Keysight N5224B 25B Service Guide 4 61 Troubleshooting This page intentionally left blank...
Страница 212: ...5 50 Keysight N5224B 25B Service Guide Theory of Operation Receiver Group Operation 5 Figure 5 17 4 Port Receiver Group...
Страница 213: ...Keysight N5224B 25B Service Guide 5 51 Theory of Operation Receiver Group Operation Figure 5 18 2 Port Receiver Group...
Страница 220: ...5 58 Keysight N5224B 25B Service Guide Theory of Operation Power Supply Group Operation 5...
Страница 225: ...Keysight N5224B 25B Service Guide 6 5 Replaceable Parts Rebuilt Exchange Assemblies Figure 6 1 Module Exchange Procedure...
Страница 490: ...6 270 Keysight N5224B 25B Service Guide Replaceable Parts Replaceable Parts Listings 6...
Страница 608: ...8 102 Keysight N5224B 25B Service Guide General Purpose Maintenance Procedures Correction Constants 8...
Страница 612: ...Appendix 4 Service Guide EEPROM Address Assignments and Location N5224 5A B PNA and N5244 5A B PNA X Instruments...
Страница 613: ...Installation Note Xxxxx xxxxx 3...