
7-76 Keysight N5224B/25B Service Guide
Repair and Replacement Procedures
Removing and Replacing the Lithium Battery
7-
Removing and Replacing the Lithium Battery
Tools Required
— T-10 TORX driver (torque to 9 in-lb or 1.02 N.m)
— T-20 TORX driver (torque to 21 in-lb or 2.38 N.m)
— ESD grounding wrist strap
Removal Procedure
Refer to
for this procedure.
1.
Disconnect the power cord.
2.
Remove the solid state drive (SSD) from the A21 CPU board. Refer to
“Removing and Replacing the A55 Solid State Drive (SSD)” on page 7-57
.
3.
Remove 22 top cover attachment screws (item
).
4.
Remove the top cover from the A21 CPU board assembly.
5.
Remove the battery from the battery holder by lifting it at the open end of
the holder and then sliding it from under the clip (item
).
6.
DO NOT THROW AWAY THE BATTERY. COLLECT IT AS SMALL CHEMICAL
“Lithium Battery Disposal” on page 1-12
for additional
information on battery disposal.
Replacement Procedure
1.
Reverse the order of the removal procedure following all instructions
included with the new battery.
2.
Perform the post-repair adjustments, verifications, and performance tests
that pertain to this removal procedure. Refer to
.
Содержание N5224B
Страница 3: ...3...
Страница 4: ...4...
Страница 12: ...12 Keysight N5224B 25B Service Guide Contents...
Страница 84: ...3 52 Keysight N5224B 25B Service Guide Tests and Adjustments Adjustments 3...
Страница 145: ...Keysight N5224B 25B Service Guide 4 61 Troubleshooting This page intentionally left blank...
Страница 212: ...5 50 Keysight N5224B 25B Service Guide Theory of Operation Receiver Group Operation 5 Figure 5 17 4 Port Receiver Group...
Страница 213: ...Keysight N5224B 25B Service Guide 5 51 Theory of Operation Receiver Group Operation Figure 5 18 2 Port Receiver Group...
Страница 220: ...5 58 Keysight N5224B 25B Service Guide Theory of Operation Power Supply Group Operation 5...
Страница 225: ...Keysight N5224B 25B Service Guide 6 5 Replaceable Parts Rebuilt Exchange Assemblies Figure 6 1 Module Exchange Procedure...
Страница 490: ...6 270 Keysight N5224B 25B Service Guide Replaceable Parts Replaceable Parts Listings 6...
Страница 608: ...8 102 Keysight N5224B 25B Service Guide General Purpose Maintenance Procedures Correction Constants 8...
Страница 612: ...Appendix 4 Service Guide EEPROM Address Assignments and Location N5224 5A B PNA and N5244 5A B PNA X Instruments...
Страница 613: ...Installation Note Xxxxx xxxxx 3...