
Keysight N5224B/25B Service Guide 3-5
Tests and Adjustments
Before You Begin
Allow the Analyzer to Warm Up
Review the Principles of Connector Care
Proper connector care and connection techniques are critical for accurate and
repeatable measurements. Refer to
for tips on connector care.
Prior to making connections to your analyzer, carefully review the information
about inspecting, cleaning, and gaging connectors. Refer to the calibration kit
documentation for detailed connector care information.
For course numbers about additional connector care instruction, contact
Keysight Technologies. Refer to
“Contacting Keysight” on page 2-7
To achieve the maximum system stability, allow the analyzer to warm up
for at least 90 minutes.
Cleaning connectors with alcohol shall only be done with the
instrument power cord removed and in a well-ventilated area. Allow
all residual alcohol moisture to evaporate, and the fumes to
dissipate prior to energizing the instrument.
Table 3-1
Connector Care Quick Reference Guide
Handling and Storage
Do
— Keep connectors clean
Do Not
— Touch mating-plane surfaces
— Extend sleeve or connector nut
— Set connectors contact-end down
— Use plastic end-caps during storage
— Store connectors or adapters loose
Visual Inspection
Do
— Inspect all connectors carefully
Do Not
— Use a damaged connector - ever
— Look for metal particles, scratches, and
dents
Connector Cleaning
Do
— Try compressed air first
Do Not
— Use any abrasives
— Use isopropyl alcohol
a
— Get liquid into plastic support beads
— Clean connector threads
Gaging Connectors
Do
— Clean and zero the gage before use
Do Not
— Use an out-of-specification
connector
— Use the correct gage type
— Use correct end of calibration block
Содержание N5224B
Страница 3: ...3...
Страница 4: ...4...
Страница 12: ...12 Keysight N5224B 25B Service Guide Contents...
Страница 84: ...3 52 Keysight N5224B 25B Service Guide Tests and Adjustments Adjustments 3...
Страница 145: ...Keysight N5224B 25B Service Guide 4 61 Troubleshooting This page intentionally left blank...
Страница 212: ...5 50 Keysight N5224B 25B Service Guide Theory of Operation Receiver Group Operation 5 Figure 5 17 4 Port Receiver Group...
Страница 213: ...Keysight N5224B 25B Service Guide 5 51 Theory of Operation Receiver Group Operation Figure 5 18 2 Port Receiver Group...
Страница 220: ...5 58 Keysight N5224B 25B Service Guide Theory of Operation Power Supply Group Operation 5...
Страница 225: ...Keysight N5224B 25B Service Guide 6 5 Replaceable Parts Rebuilt Exchange Assemblies Figure 6 1 Module Exchange Procedure...
Страница 490: ...6 270 Keysight N5224B 25B Service Guide Replaceable Parts Replaceable Parts Listings 6...
Страница 608: ...8 102 Keysight N5224B 25B Service Guide General Purpose Maintenance Procedures Correction Constants 8...
Страница 612: ...Appendix 4 Service Guide EEPROM Address Assignments and Location N5224 5A B PNA and N5244 5A B PNA X Instruments...
Страница 613: ...Installation Note Xxxxx xxxxx 3...