5-56 Keysight N5224B/25B Service Guide
Theory of Operation
Digital Processing and Digital Control Group Operation
5-
Main RAM
The main random access memory (RAM) is shared memory for the CPU and the
DSP. It stores the raw data received from the DSP while additional calculations
are performed on it by the CPU. The CPU reads the resulting formatted data
from the main RAM, converts it to a user-definable display format, and writes
this to the video processor for display.
Rear Panel Interconnects
The rear panel includes the following interfaces:
A55 Solid State Drive (SSD)
The solid state drive (SSD) is a Serial Advanced Technology Attachment (SATA)
data storage device which is connected directly to, and physically mounted
within the enclosure of, the A21 CPU board. The full operating system and
firmware for the network analyzer is stored on the A55 solid state drive.
USB x4
Four universal serial bus (USB) jacks (industry standard 4-pin connectors).
GPIB (0)
Controller
A 24-pin, female, type D-24 connector that meets IEEE-488 standards.
GPIB (1)
Talker/Listener
A 24-pin, female, type D-24 connector that meets IEEE-488 standards.
LAN
A standard 8-pin, 10/100BaseT, Ethernet connection. It auto selects between the two data
rates.
Display (VGA)
A 15-pin, female, D-sub connector that provides a video output of the analyzer display that can
be viewed on an external VGA monitor.
Содержание N5224B
Страница 3: ...3...
Страница 4: ...4...
Страница 12: ...12 Keysight N5224B 25B Service Guide Contents...
Страница 84: ...3 52 Keysight N5224B 25B Service Guide Tests and Adjustments Adjustments 3...
Страница 145: ...Keysight N5224B 25B Service Guide 4 61 Troubleshooting This page intentionally left blank...
Страница 212: ...5 50 Keysight N5224B 25B Service Guide Theory of Operation Receiver Group Operation 5 Figure 5 17 4 Port Receiver Group...
Страница 213: ...Keysight N5224B 25B Service Guide 5 51 Theory of Operation Receiver Group Operation Figure 5 18 2 Port Receiver Group...
Страница 220: ...5 58 Keysight N5224B 25B Service Guide Theory of Operation Power Supply Group Operation 5...
Страница 225: ...Keysight N5224B 25B Service Guide 6 5 Replaceable Parts Rebuilt Exchange Assemblies Figure 6 1 Module Exchange Procedure...
Страница 490: ...6 270 Keysight N5224B 25B Service Guide Replaceable Parts Replaceable Parts Listings 6...
Страница 608: ...8 102 Keysight N5224B 25B Service Guide General Purpose Maintenance Procedures Correction Constants 8...
Страница 612: ...Appendix 4 Service Guide EEPROM Address Assignments and Location N5224 5A B PNA and N5244 5A B PNA X Instruments...
Страница 613: ...Installation Note Xxxxx xxxxx 3...