
7-22 Keysight N5224B/25B Service Guide
Repair and Replacement Procedures
Removing and Replacing the A18 System Motherboard
7-
Removing and Replacing the A18 System Motherboard
Tools Required
— T-10 TORX driver (torque to 9 in-lb or 1.02 N.m)
— T-20 TORX driver (torque to 21 in-lb or 2.38 N.m)
— 5/16 inch open-end torque wrench (torque to 10 in-lb or 1.13 N.m)
— 5/8 inch nutsetter (torque to 21 in-lb or 2.38 N.m)
— ESD grounding wrist strap
Removal Procedure
Refer to
for this
procedure.
1.
Disconnect the power cord.
2.
Remove the outer and inner covers. Refer to
.
3.
Remove the front panel assembly. Refer to
Front Panel Assembly” on page 7-9
.
4.
Remove the A20 power supply. Refer to
“Removing and Replacing the A20
Power Supply Assembly” on page 7-27
.
5.
“Removing and Replacing the A21 CPU
.
6.
Disconnect the rear panel cables.
7.
Remove the threaded hardware from the rear panel.
8.
Remove the rear panel.
9.
Remove the A22 GPIB board. Refer to
“Removing and Replacing the A22
10.
Remove the A19 midplane board. Refer to
A19 Midplane Board” on page 7-25
11.
Remove the A4–A17 boards. Refer to
.
12.
Remove the right side and left side fan brackets. Disconnect the right fan
wire and the left fan wire from the A18 System Motherboard, and then
remove the fan brackets. Refer to
“Removing and Replacing the Fans” on
.
Be careful not to damage the center pins of the semirigid cables. Some
flexing of the cables is necessary to remove assemblies but do not
over-bend them.
Any cables that are removed should be labeled for reinstallation later.
Содержание N5224B
Страница 3: ...3...
Страница 4: ...4...
Страница 12: ...12 Keysight N5224B 25B Service Guide Contents...
Страница 84: ...3 52 Keysight N5224B 25B Service Guide Tests and Adjustments Adjustments 3...
Страница 145: ...Keysight N5224B 25B Service Guide 4 61 Troubleshooting This page intentionally left blank...
Страница 212: ...5 50 Keysight N5224B 25B Service Guide Theory of Operation Receiver Group Operation 5 Figure 5 17 4 Port Receiver Group...
Страница 213: ...Keysight N5224B 25B Service Guide 5 51 Theory of Operation Receiver Group Operation Figure 5 18 2 Port Receiver Group...
Страница 220: ...5 58 Keysight N5224B 25B Service Guide Theory of Operation Power Supply Group Operation 5...
Страница 225: ...Keysight N5224B 25B Service Guide 6 5 Replaceable Parts Rebuilt Exchange Assemblies Figure 6 1 Module Exchange Procedure...
Страница 490: ...6 270 Keysight N5224B 25B Service Guide Replaceable Parts Replaceable Parts Listings 6...
Страница 608: ...8 102 Keysight N5224B 25B Service Guide General Purpose Maintenance Procedures Correction Constants 8...
Страница 612: ...Appendix 4 Service Guide EEPROM Address Assignments and Location N5224 5A B PNA and N5244 5A B PNA X Instruments...
Страница 613: ...Installation Note Xxxxx xxxxx 3...