
Keysight N5224B/25B Service Guide 7-29
Repair and Replacement Procedures
Removing and Replacing the A21 CPU Board Assembly
Removing and Replacing the A21 CPU Board Assembly
Tools Required
— T-10 TORX driver (torque to 9 in-lb or 1.02 N.m)
— T-20 TORX driver (torque to 21 in-lb or 2.38 N.m)
— ESD grounding wrist strap
Removal Procedure
Refer to
for this procedure.
1.
Disconnect the power cord.
2.
It is
not
necessary to remove the instrument cover(s) to remove the A21
CPU board assembly.
3.
Remove six screws (item
) from the A21 CPU board assembly - four from
the CPU assembly rear panel and two from the ejector handles.
4.
Grasp the two ejector handles and rotate them outward toward the sides
of the analyzer as shown in the illustration. This will disengage the A21
CPU board assembly from the A19 midplane board.
5.
Slide the A21 CPU board assembly out the rear of the analyzer.
6.
If the A21 CPU board assembly is being replaced, you must first remove
the A55 solid state drive for reinstallation in the new A21 CPU board
“Removing and Replacing the A55 Solid State Drive
Replacement Procedure
1.
Reverse the order of the removal procedure.
2.
Perform the post-repair adjustments, verifications, and performance tests
that pertain to this removal procedure. Refer to
.
Содержание N5224B
Страница 3: ...3...
Страница 4: ...4...
Страница 12: ...12 Keysight N5224B 25B Service Guide Contents...
Страница 84: ...3 52 Keysight N5224B 25B Service Guide Tests and Adjustments Adjustments 3...
Страница 145: ...Keysight N5224B 25B Service Guide 4 61 Troubleshooting This page intentionally left blank...
Страница 212: ...5 50 Keysight N5224B 25B Service Guide Theory of Operation Receiver Group Operation 5 Figure 5 17 4 Port Receiver Group...
Страница 213: ...Keysight N5224B 25B Service Guide 5 51 Theory of Operation Receiver Group Operation Figure 5 18 2 Port Receiver Group...
Страница 220: ...5 58 Keysight N5224B 25B Service Guide Theory of Operation Power Supply Group Operation 5...
Страница 225: ...Keysight N5224B 25B Service Guide 6 5 Replaceable Parts Rebuilt Exchange Assemblies Figure 6 1 Module Exchange Procedure...
Страница 490: ...6 270 Keysight N5224B 25B Service Guide Replaceable Parts Replaceable Parts Listings 6...
Страница 608: ...8 102 Keysight N5224B 25B Service Guide General Purpose Maintenance Procedures Correction Constants 8...
Страница 612: ...Appendix 4 Service Guide EEPROM Address Assignments and Location N5224 5A B PNA and N5244 5A B PNA X Instruments...
Страница 613: ...Installation Note Xxxxx xxxxx 3...