
Keysight N5224B/25B Service Guide 7-9
Repair and Replacement Procedures
Removing and Replacing the Front Panel Assembly
Removing and Replacing the Front Panel Assembly
Tools Required
— T-10 TORX driver (set to 9 in-lb)
— T-20 TORX driver (set to 21 in-lb)
— 5/16 inch open-end torque wrench (set to 10 in-lb)
— ESD grounding wrist strap
Removal Procedure
Refer to
for this procedure.
1.
Disconnect the power cord.
2.
Remove the outer cover. Refer to
“Removing the Covers” on page 7-7
3.
With a 5/16 inch torque wrench, remove all the semi-rigid jumpers (item
) from the front panel.
4.
With a T-10 TORX driver, remove the 12 screws (item
) from the sides of
the frame.
5.
Remove the lower panel overlay.
6.
With a T-10 TORX, remove the 2 screws (2-Port) or 4 screws (4-Port).
7.
Slide the front panel over the test port connectors.
8.
Disconnect the ribbon cable (item
) from the A1 front panel interface
board.
Replacement Procedure
1.
Reverse the order of the removal procedure.
2.
Perform the post-repair adjustments, verifications, and performance tests
that pertain to this removal procedure. Refer to
.
Before removing the front panel from the analyzer, lift and support the
front of the analyzer frame.
When reconnecting the front-panel jumpers, torque the connectors to 10
in-lb.
Содержание N5224B
Страница 3: ...3...
Страница 4: ...4...
Страница 12: ...12 Keysight N5224B 25B Service Guide Contents...
Страница 84: ...3 52 Keysight N5224B 25B Service Guide Tests and Adjustments Adjustments 3...
Страница 145: ...Keysight N5224B 25B Service Guide 4 61 Troubleshooting This page intentionally left blank...
Страница 212: ...5 50 Keysight N5224B 25B Service Guide Theory of Operation Receiver Group Operation 5 Figure 5 17 4 Port Receiver Group...
Страница 213: ...Keysight N5224B 25B Service Guide 5 51 Theory of Operation Receiver Group Operation Figure 5 18 2 Port Receiver Group...
Страница 220: ...5 58 Keysight N5224B 25B Service Guide Theory of Operation Power Supply Group Operation 5...
Страница 225: ...Keysight N5224B 25B Service Guide 6 5 Replaceable Parts Rebuilt Exchange Assemblies Figure 6 1 Module Exchange Procedure...
Страница 490: ...6 270 Keysight N5224B 25B Service Guide Replaceable Parts Replaceable Parts Listings 6...
Страница 608: ...8 102 Keysight N5224B 25B Service Guide General Purpose Maintenance Procedures Correction Constants 8...
Страница 612: ...Appendix 4 Service Guide EEPROM Address Assignments and Location N5224 5A B PNA and N5244 5A B PNA X Instruments...
Страница 613: ...Installation Note Xxxxx xxxxx 3...