Chapter 4: Calibrating and Adjusting
To run the self calibration
69
To run the self calibration
Equipment Required
1
Select Calibration from the Utilities menu.
2
If the Cal Memory Protect box in the Calibration dialog is checked, select the
check box to clear the check mark.
Equipment
Critical Specifications
Recommended Model/Part
Adapters (2)
BNC (f) to BNC (m) right angle
Keysight 1250-0076
Cable
BNC 50
Ω
Keysight
8120-1839
Let the Oscilloscope Warm Up Before Running the Self Calibration
The self calibration should only be done after the oscilloscope has run for 30 minutes at ambient temperature
with the covers installed.
Calibration time
It will take approximately 45 minutes to run the self calibration on the oscilloscope, including the time required
to change cables from channel to channel.
Содержание Infiniium 8000 Series
Страница 6: ...6...
Страница 31: ...Chapter 2 Preparing for Use Digital probe lead set 31 Data Sheets Demonstrations Catalogs...
Страница 66: ...Chapter 3 Testing Performance Performance Test Record 66...
Страница 140: ...Chapter 7 Replaceable Parts Exploded Views 140 Exploded Views Front Frame and Front Panel...
Страница 141: ...Chapter 7 Replaceable Parts Exploded Views 141 Fan and Acquisition Assembly...
Страница 142: ...Chapter 7 Replaceable Parts Exploded Views 142 Power Supply and PC Motherboard Without Option 017...
Страница 143: ...Chapter 7 Replaceable Parts Exploded Views 143 Power Supply and PC Motherboard With Option 017...
Страница 144: ...Chapter 7 Replaceable Parts Exploded Views 144 Sleeve and Accessory Pouch...
Страница 150: ...Chapter 8 Theory of Operation 150 Figure 8 1 Oscilloscope Block Diagram...
Страница 158: ...158...
Страница 160: ...160 Index...