70 Installation Note N5222-90114
Installation Procedure for the Upgrade
-
Step 41. Install the Other End of the Bias-Tee Combiner Cables to the
Source Synthesizer and LO Synthesizer Board Gray Cables
Refer to
. New parts are listed in
1.
The analyzer should be positioned on its left side (fans facing upwards) as
shown.
2. Verify
the previously installed N5245-60078 (item
) and N5242-60080
(item
) cables are still securely connected.
3.
Connect the new N5242-60079 (item
) flexible cable as indicated in
Figure 41
New test set cables. Connect/Verify the other end of the N5242-60078,
N5242-60079, and N5245-60080 cables