Installation Note N5222-90114
17
Installation Procedure for the Upgrade
“Step 46. DC Continuity Test the LFE Board and Test Ports.”
“Step 47. Position the Cables and Wires to Prevent Pinching.”
“Step 48. Reinstall the Inner Cover.”
“Step 49. Reinstall the Outer Cover.”
“Step 50. Remove Option 205 License.”
“Step 52. Verify the PNA Analyzer Program is Running with the Correct
“Step 53. Perform Post-Upgrade Adjustments and Calibration.”
“Step 54. Prepare the PNA for the User.”
Step 1. Obtain a Keyword and Verify the Information
Follow the instructions on the Software Entitlement Certificate supplied to
obtain a license key file for installation of this upgrade. Refer to
.
Verify that the model number, serial number, and option number information
on the license key match those of the instrument on which this upgrade will be
installed.
Once the license key file has been received and the information verified, you
can proceed with the installation at step 2.
Step 2. Remove the Outer Cover
For instructions, click the Chapter 7 bookmark “Removing the Covers” in the
PDF Service Guide.
Step 3. Remove the Inner Cover
For instructions, click the Chapter 7 bookmark “Removing the Covers” in the
PDF Service Guide1.
If the model number, serial number, or option number do not match those
on your license key file, you will not be able to install the option. If this is
the case, contact Keysight for assistance before beginning the installation
of this upgrade. Refer to