
27
4. Control Unit
4.1 Connection Plan
4.2 Commissioning
Please follow all safety instructions in
Chapter 1
After all mechanical and electrical connec-
tions (including the 9-volt batteries located
inside the control unit) have been made,
commissioning of the system may begin.
•Plug in the control unit’s power chord to a
230V / 50 Hz outlet / power source
•The control unit will undergo a self check –
LEDs on the control unit will light from top
to bottom.
•The control unit will signal with an audible
tone
If all connections have been made correctly
the system will now be in normal operational
mode and the green LED light will be on.
In the case that the connections have been
made incorrectly an error message will be
displayed. If this is the case then disconnect
the control unit from it’s power source and
resolve the problem (see the trouble shoo-
ting section of this manual).