Installation 

C2N Series Tankless Heater

Bradley • 

215-1821 Rev. B; ECN 16-17-005 

5/3/2016

Start Up Check List

4

Plumbing

  System is set in a vertical, level, and upright position with the outlet located at the top . System is mounted to the 

wall using the (4) mounting brackets on the back of the enclosure or bolted to the floor with the optional leg kit .

  Confirm installation of shutoff valve above (upstream of) the union on the inlet connection .  Confirm installation of 

a Y-strainer (100 mesh screen) or inline filter (150 micron) between the inlet shutoff valve and the heater . 

  Pressure and temperature relief valve is installed on tepid water outlet immediately following the union . No valve 

or restriction is between the relief valve and the system or the relief valve and drain . Shutoff valve is installed 
after pressure and temperature relief valve on outlet if required by local or national plumbing codes .  

  If the hot water process is not at the highest point in the plumbing loop, then an automatic air vent valve must be 

added at the highest point in the system plumbing loop to eliminate trapped air .

Electrical

  Verify supply voltage matches the indicated voltage on the Serial Tag . Serial Tag is located within the heater 

enclosure on the upper left corner of the back plate (mounting plate) . 

  Appropriate conduit is installed properly, secured and sealed to unit enclosure per NEC and hazard 

location requirements .

  Appropriate conductors for unit routed through conduit and secured to power block inside the enclosure . All 

electrical is installed in accordance with national and local electrical codes, including fuse size and rating .

  Appropriate earth ground is installed to the lug provided on enclosure backplate .

Содержание C2N363/600D

Страница 1: ...s C2N36 C2N50 Voltage options 600V 3 phase 480V 3 phase 415V 3 phase 400V 3 phase 380V 3 phase Table of Contents Pre Installation Information 2 3 Storage Instructions 3 Mounting Heater 4 Plumbing Inst...

Страница 2: ...result in serious burns or death Disconnect power supply before performing any work in the enclosure Failure to ground this system may result in death or serious injury Make sure that all water supply...

Страница 3: ...ing quick close valves or solenoid valves it is important to install a hammer arrestor or surge tank close to the point of use to absorb pressure spikes Installation Considerations Maximum operating p...

Страница 4: ...the vertical surface Vertical surface must support 150 lbs or more Optional Leg Kit Use the floor mounting template on the side of the crate to help with alignment Secure heater by bolting each leg t...

Страница 5: ...0 B 3 3 8 86 8 203 8 3 4 222 Optional Fused Disconnect Suggested Location for Power Entrance Provided By Installer LOAD L LOAD R READY TEST FAULT RESET GROUND FAULT TEMPERATURE CONTROLLER R 1 2 3 4 5...

Страница 6: ...tranded machine tool wire from an approved isolating 3 pole switch or circuit breaker NOTICE Make sure the electrical cable is the correct size to carry 100 of the full load current See table for prop...

Страница 7: ...f valve and drain Shutoff valve is installed after pressure and temperature relief valve on outlet if required by local or national plumbing codes If the hot water process is not at the highest point...

Страница 8: ...activate the connected process requiring heated water faucet shower etc then flush the system for 5 minutes to ensure all air is purged from the system NOTICE Failure to bleed air properly will damage...

Страница 9: ...output temperature Setpoint Down Button Decreases output temperature Infinity Key Back to Home page Advance Key Advances through parameter prompts Auto Man Off C r71 Turns Control Loop On Manual Off X...

Страница 10: ...lements if the inlet water temperature is equal to or greater than the temperature set on the digital controller Perform Operational Test No 2 8 A Turn on hot water faucet fixture process The heater s...

Страница 11: ...used disconnect interlocks with enclosure door when energized prohibiting access to a live cabinet Select the FDS option for an additional level of safety and convenience at the heater location T190 H...

Страница 12: ...ery 6 months or more often in areas where hard water sediment is present in the water To clean the Y Strainer 1 Turn the power off at the circuit breaker panel 2 Shut off the installer supplied cold w...

Страница 13: ...al Specifications table in Step 3 for proper requirements 2 Unit is receiving voltage from all 3 phases of the power source A load voltage reading is also helpful 3 Verify the functionality of the flo...

Страница 14: ...Purge gas compressed air inlet fitting here EXP2 Installation Notes 1 Any tubing conduit or fittings connected to the Pressurized Enclosure PE must conform to local codes for flammability ratings 2 A...

Страница 15: ...osure and the protective gas supply The alarm actuator shall be mechanical pneumatic or electrical Electrical alarms and electrical alarm actuators shall be approved for the location in which they are...

Страница 16: ...irements No valves may be fitted between the Expo Technologies system and the alarm switch WARNING Never turn on the power without purging first unless you have proved the interior of the PE is gas fr...

Страница 17: ...larms function correctly Check the Relief Valve and any other Spark Arrestors Remove any debris or corrosion or replace the Spark Arrestor Check the condition of the air supply filter element Clean or...

Отзывы: