background image

8

C2N Series Tankless Heater

 Installation

5/3/2016 

Bradley • 

215-1821 Rev. B; ECN 16-17-005

Start Up

5

A

Slowly turn on water supply to the unit 
with the enclosure door open and the 
circuit breaker in the off position .

C

Turn off the connected process and 
check the entire system to verify leak-free 
installation . 

H

Turn on the connected process; observe 
output temperature rise to setpoint . 

NOTE: Top portion of temperature 
controller displays output temperature, 
bottom displays setpoint temperature.

D

Close enclosure door and secure .

F

Energize the electrical service to the unit 
by switching on the circuit breaker . 

G

Unit is now in the ready state . 

B

Slowly turn on the water outlet valve, 
activate the connected process requiring 
heated water (faucet, shower, etc .), then 
flush the system for 5 minutes to ensure all 
air is purged from the system . 

NOTICE! Failure to bleed air properly 

will damage elements and 
cause heater malfunction.

Be sure that plumbing and electrical are complete per Start Up Check List.

WARNING Make sure the circuit breaker for the heater is OFF.

I

When startup is complete, leave circuit 
breaker in the ON position . The Green 
power light should be illuminated .

E

If your heater has the EXP2 option and 
is located in a Class I Division 2 area, 
please review Special Instructions & 
Operation Instructions section for all 
proper electrical connections and sealing 
to ensure the installation will provide the 
proper protection. 

Proceed to Step F once 

you have completed the steps in the Spercial 
Instructions & Operation Instructions or if you 
do not have this option . 

Содержание C2N363/600D

Страница 1: ...s C2N36 C2N50 Voltage options 600V 3 phase 480V 3 phase 415V 3 phase 400V 3 phase 380V 3 phase Table of Contents Pre Installation Information 2 3 Storage Instructions 3 Mounting Heater 4 Plumbing Inst...

Страница 2: ...result in serious burns or death Disconnect power supply before performing any work in the enclosure Failure to ground this system may result in death or serious injury Make sure that all water supply...

Страница 3: ...ing quick close valves or solenoid valves it is important to install a hammer arrestor or surge tank close to the point of use to absorb pressure spikes Installation Considerations Maximum operating p...

Страница 4: ...the vertical surface Vertical surface must support 150 lbs or more Optional Leg Kit Use the floor mounting template on the side of the crate to help with alignment Secure heater by bolting each leg t...

Страница 5: ...0 B 3 3 8 86 8 203 8 3 4 222 Optional Fused Disconnect Suggested Location for Power Entrance Provided By Installer LOAD L LOAD R READY TEST FAULT RESET GROUND FAULT TEMPERATURE CONTROLLER R 1 2 3 4 5...

Страница 6: ...tranded machine tool wire from an approved isolating 3 pole switch or circuit breaker NOTICE Make sure the electrical cable is the correct size to carry 100 of the full load current See table for prop...

Страница 7: ...f valve and drain Shutoff valve is installed after pressure and temperature relief valve on outlet if required by local or national plumbing codes If the hot water process is not at the highest point...

Страница 8: ...activate the connected process requiring heated water faucet shower etc then flush the system for 5 minutes to ensure all air is purged from the system NOTICE Failure to bleed air properly will damage...

Страница 9: ...output temperature Setpoint Down Button Decreases output temperature Infinity Key Back to Home page Advance Key Advances through parameter prompts Auto Man Off C r71 Turns Control Loop On Manual Off X...

Страница 10: ...lements if the inlet water temperature is equal to or greater than the temperature set on the digital controller Perform Operational Test No 2 8 A Turn on hot water faucet fixture process The heater s...

Страница 11: ...used disconnect interlocks with enclosure door when energized prohibiting access to a live cabinet Select the FDS option for an additional level of safety and convenience at the heater location T190 H...

Страница 12: ...ery 6 months or more often in areas where hard water sediment is present in the water To clean the Y Strainer 1 Turn the power off at the circuit breaker panel 2 Shut off the installer supplied cold w...

Страница 13: ...al Specifications table in Step 3 for proper requirements 2 Unit is receiving voltage from all 3 phases of the power source A load voltage reading is also helpful 3 Verify the functionality of the flo...

Страница 14: ...Purge gas compressed air inlet fitting here EXP2 Installation Notes 1 Any tubing conduit or fittings connected to the Pressurized Enclosure PE must conform to local codes for flammability ratings 2 A...

Страница 15: ...osure and the protective gas supply The alarm actuator shall be mechanical pneumatic or electrical Electrical alarms and electrical alarm actuators shall be approved for the location in which they are...

Страница 16: ...irements No valves may be fitted between the Expo Technologies system and the alarm switch WARNING Never turn on the power without purging first unless you have proved the interior of the PE is gas fr...

Страница 17: ...larms function correctly Check the Relief Valve and any other Spark Arrestors Remove any debris or corrosion or replace the Spark Arrestor Check the condition of the air supply filter element Clean or...

Отзывы: