background image

9

Installation 

C2N Series Tankless Heater

Bradley • 

215-1821 Rev. B; ECN 16-17-005 

5/3/2016

Digital Controller Operation

6

The preprogrammed digital controller is mounted through the bezel on the enclosure door. The digital 
controller will be powered but the bottom display will read OFF until water is flowing through the heater. 
The bottom display will then display the setpoint temperature (See Digital Controller Operation section for 
more information). 

Refer to table and drawings below for instructions to change the desired set 
point temperature of the controller.

Description

Upper Display

Lower Display

 Function

EZ Key

 

 

Toggles output on/off

Setpoint Up Button

 

 

Increases output temperature

Setpoint Down Button

 

 

Decreases output temperature

Infinity Key

 

 

Back to Home page

Advance Key

 

 

Advances through parameter prompts

Auto, Man, Off

C .r71

Turns Control Loop On/Manual/Off

XX .X%

h .Pr1

Heater Power %

no

AUt1

Autotune (Contact Factory)

C or F

C_F1

Change Temperature Units from F to C

Output Indicators (1-5)

 

 

Output 1,2,3,4 or 5 are active and operating if 
these LEDs are illuminated .

Setpoint Temperature 
(Lower Display)

Displays:

•  Setpoint
•  Percent Power
•  Temperature units F or C
•  Menu prompt name
•  Alarm code

Output Temperature 
(Upper Display)

 

 

Displays:

•  Actual process temp . of outgoing water
•  Prompt parameter value 
•  Error code (feature disabled)

Output Indicators

Output Temp .

Output 

Temp .

Output 

Temp .

No Flow

Setpoint 

Temp .

Setpoint Temp .

Setpoint Up

Setpoint Down

Advance Key

Infinity Key

EZ Key

Layout Diagram

ON - Heating

OFF - No Flow

1

2
3
4
5

1

2
3
4
5

1

2
3
4
5

Содержание C2N363/600D

Страница 1: ...s C2N36 C2N50 Voltage options 600V 3 phase 480V 3 phase 415V 3 phase 400V 3 phase 380V 3 phase Table of Contents Pre Installation Information 2 3 Storage Instructions 3 Mounting Heater 4 Plumbing Inst...

Страница 2: ...result in serious burns or death Disconnect power supply before performing any work in the enclosure Failure to ground this system may result in death or serious injury Make sure that all water supply...

Страница 3: ...ing quick close valves or solenoid valves it is important to install a hammer arrestor or surge tank close to the point of use to absorb pressure spikes Installation Considerations Maximum operating p...

Страница 4: ...the vertical surface Vertical surface must support 150 lbs or more Optional Leg Kit Use the floor mounting template on the side of the crate to help with alignment Secure heater by bolting each leg t...

Страница 5: ...0 B 3 3 8 86 8 203 8 3 4 222 Optional Fused Disconnect Suggested Location for Power Entrance Provided By Installer LOAD L LOAD R READY TEST FAULT RESET GROUND FAULT TEMPERATURE CONTROLLER R 1 2 3 4 5...

Страница 6: ...tranded machine tool wire from an approved isolating 3 pole switch or circuit breaker NOTICE Make sure the electrical cable is the correct size to carry 100 of the full load current See table for prop...

Страница 7: ...f valve and drain Shutoff valve is installed after pressure and temperature relief valve on outlet if required by local or national plumbing codes If the hot water process is not at the highest point...

Страница 8: ...activate the connected process requiring heated water faucet shower etc then flush the system for 5 minutes to ensure all air is purged from the system NOTICE Failure to bleed air properly will damage...

Страница 9: ...output temperature Setpoint Down Button Decreases output temperature Infinity Key Back to Home page Advance Key Advances through parameter prompts Auto Man Off C r71 Turns Control Loop On Manual Off X...

Страница 10: ...lements if the inlet water temperature is equal to or greater than the temperature set on the digital controller Perform Operational Test No 2 8 A Turn on hot water faucet fixture process The heater s...

Страница 11: ...used disconnect interlocks with enclosure door when energized prohibiting access to a live cabinet Select the FDS option for an additional level of safety and convenience at the heater location T190 H...

Страница 12: ...ery 6 months or more often in areas where hard water sediment is present in the water To clean the Y Strainer 1 Turn the power off at the circuit breaker panel 2 Shut off the installer supplied cold w...

Страница 13: ...al Specifications table in Step 3 for proper requirements 2 Unit is receiving voltage from all 3 phases of the power source A load voltage reading is also helpful 3 Verify the functionality of the flo...

Страница 14: ...Purge gas compressed air inlet fitting here EXP2 Installation Notes 1 Any tubing conduit or fittings connected to the Pressurized Enclosure PE must conform to local codes for flammability ratings 2 A...

Страница 15: ...osure and the protective gas supply The alarm actuator shall be mechanical pneumatic or electrical Electrical alarms and electrical alarm actuators shall be approved for the location in which they are...

Страница 16: ...irements No valves may be fitted between the Expo Technologies system and the alarm switch WARNING Never turn on the power without purging first unless you have proved the interior of the PE is gas fr...

Страница 17: ...larms function correctly Check the Relief Valve and any other Spark Arrestors Remove any debris or corrosion or replace the Spark Arrestor Check the condition of the air supply filter element Clean or...

Отзывы: