background image

11

Installation 

C2N Series Tankless Heater

Bradley • 

215-1821 Rev. B; ECN 16-17-005 

5/3/2016

Output heating capacity is reduced if these heaters are installed on 415V, 400V or 380V 3-ph . 
Contact the factory to supply this information .
Satisfactory performance of the heater is dependent upon a specific flow rate vs temperature rise capability . If the 
desired temperature is not achieved, please verify the following:

1 .  Circuit breaker is on and rated for the maximum power draw .
2 .  Heater is drawing the proper current for the supply voltage on all 3 phases .
3 .  All 3 phase indicator lights are lit (not flashing) indicating maximum power draw and maximum 

amperage is being drawn .  

4 .  Flow rate and temperature rise in the water heating process are compatible with the heater specifications .  
5 .  Verify there is no additional supply of cold water entering the line downstream of the heater .  

Product Options 

GF (Ground Fault):

 Detects electrical leakage from external sources to protect equipment, electronics, and the heat 

exchanger from being damaged in the event of a power fault . After turning on water, then power, test ground fault:

1 .  Press GF Test button .  
2 .  Watch for ground fault light to illuminate and Bank Ready light(s) to shut off . The Ground Fault system is active 

and in working order .  

3 .  Press the GF Reset button, hold for 2 seconds and release to reset ground fault .

FDS Fused Disconnect:

 Internal fused disconnect interlocks with enclosure door when energized, prohibiting access 

to a live cabinet . Select the FDS option for an additional level of safety and convenience at the heater location .

T190 High Temperature Option:

 Reach and maintain temperatures as high as 190°F (88°C) .

D1 Control Interface:

 Provides 4–20ma communication interface with temperature controller .

TE & TE2 Corrosive Fluid Protection:

 The TE option is a PFA Teflon

®

 coated heat exchanger with bright annealed 

stainless steel elements,FDA Approved (use for deionized water or mild corrosive fluid applications) . Similar to TE, 
the TE2 option is a single layer of Xylan Fluoropolymeric coated heat exchanger with bright annealed stainless steel 
elements, FDA Approved for Food Contact (use in deionized water applications) .

EXP2 (Explosion Proof Purge System):

 Keltech's EXP2 option makes heaters compliant for classified areas; 

Class I Division 2, Groups A, B, C, D, Temp Code: T5 . The Purge System requires a supply of clean instrument air or 
inert gas (provided by installer) . This supply maintains a positive internal pressure and prevents the enclosure from 
filling with flammable gases, dusts or vapors from the ambient environment . Complete installation provided in this 
manual .

Low Flow (L5):

 0 .50 GPM (1 .9 lpm) option for heating water when lower flow rates are required .

N4X (NEMA 4X Enclosure):

 Corrosion resistant enclosure made of stainless steel and ideal for harsh environments .

If a trip occurs under normal operation DO NOT RESET Ground Fault without evaluation and 
service. 

Normal state is Ground Fault light OFF, Bank Ready lights ON.

Содержание C2N363/600D

Страница 1: ...s C2N36 C2N50 Voltage options 600V 3 phase 480V 3 phase 415V 3 phase 400V 3 phase 380V 3 phase Table of Contents Pre Installation Information 2 3 Storage Instructions 3 Mounting Heater 4 Plumbing Inst...

Страница 2: ...result in serious burns or death Disconnect power supply before performing any work in the enclosure Failure to ground this system may result in death or serious injury Make sure that all water supply...

Страница 3: ...ing quick close valves or solenoid valves it is important to install a hammer arrestor or surge tank close to the point of use to absorb pressure spikes Installation Considerations Maximum operating p...

Страница 4: ...the vertical surface Vertical surface must support 150 lbs or more Optional Leg Kit Use the floor mounting template on the side of the crate to help with alignment Secure heater by bolting each leg t...

Страница 5: ...0 B 3 3 8 86 8 203 8 3 4 222 Optional Fused Disconnect Suggested Location for Power Entrance Provided By Installer LOAD L LOAD R READY TEST FAULT RESET GROUND FAULT TEMPERATURE CONTROLLER R 1 2 3 4 5...

Страница 6: ...tranded machine tool wire from an approved isolating 3 pole switch or circuit breaker NOTICE Make sure the electrical cable is the correct size to carry 100 of the full load current See table for prop...

Страница 7: ...f valve and drain Shutoff valve is installed after pressure and temperature relief valve on outlet if required by local or national plumbing codes If the hot water process is not at the highest point...

Страница 8: ...activate the connected process requiring heated water faucet shower etc then flush the system for 5 minutes to ensure all air is purged from the system NOTICE Failure to bleed air properly will damage...

Страница 9: ...output temperature Setpoint Down Button Decreases output temperature Infinity Key Back to Home page Advance Key Advances through parameter prompts Auto Man Off C r71 Turns Control Loop On Manual Off X...

Страница 10: ...lements if the inlet water temperature is equal to or greater than the temperature set on the digital controller Perform Operational Test No 2 8 A Turn on hot water faucet fixture process The heater s...

Страница 11: ...used disconnect interlocks with enclosure door when energized prohibiting access to a live cabinet Select the FDS option for an additional level of safety and convenience at the heater location T190 H...

Страница 12: ...ery 6 months or more often in areas where hard water sediment is present in the water To clean the Y Strainer 1 Turn the power off at the circuit breaker panel 2 Shut off the installer supplied cold w...

Страница 13: ...al Specifications table in Step 3 for proper requirements 2 Unit is receiving voltage from all 3 phases of the power source A load voltage reading is also helpful 3 Verify the functionality of the flo...

Страница 14: ...Purge gas compressed air inlet fitting here EXP2 Installation Notes 1 Any tubing conduit or fittings connected to the Pressurized Enclosure PE must conform to local codes for flammability ratings 2 A...

Страница 15: ...osure and the protective gas supply The alarm actuator shall be mechanical pneumatic or electrical Electrical alarms and electrical alarm actuators shall be approved for the location in which they are...

Страница 16: ...irements No valves may be fitted between the Expo Technologies system and the alarm switch WARNING Never turn on the power without purging first unless you have proved the interior of the PE is gas fr...

Страница 17: ...larms function correctly Check the Relief Valve and any other Spark Arrestors Remove any debris or corrosion or replace the Spark Arrestor Check the condition of the air supply filter element Clean or...

Отзывы: