6

C2N Series Tankless Heater

 Installation

5/3/2016 

Bradley • 

215-1821 Rev. B; ECN 16-17-005

Electric Installation

3

WARNING Failure to properly ground the unit(s) per the National Electric Code could result in injury 

or death.

B

Using a hole punch, cut a hole the proper 
size for conduit connection; large enough 
for the wire size for each heater . The 
connectors need to be rated NEMA4/4X 
to ensure proper sealing of the enclosure .

A

Open enclosure door .

C

Run wires through the appropriate size 
conduit .

D

Connect wires to the system terminal 
block or fused disconnect inside the 
enclosure .  

E

Connect the ground wire to the stud 
provided with the “Ground” label beneath it .  

NOTICE!  Any option that requires field wiring 

must be done with 600V cable per the 
schematic that was shipped with the 
heater.

NOTICE!  Use a 4-core cable or multi-stranded 

machine tool wire from an approved 
isolating 3-pole switch or circuit 
breaker. 

NOTICE!  Make sure the electrical cable is the 

correct size to carry 100% of the full 
load current. See table for proper 
wire sizes. 

WARNING All Keltech heaters must be fused in accordance with National Electric Code (NEC) for the 

full load amperage listed on the nameplate rating for each heater.

ELECTRICAL SPECIFICATIONS FOR HEATER (3 Phase)

Model

Voltage

Amps

kWatts

Min Wire 

Size

C2N363/600D

600

35

36

6 AWG*

C2N503/600D

600

49

50

4 AWG*

C2N363/480D

480

43

36

6 AWG*

C2N503/480D

480

60

50

3 AWG*

C2N363/415D

415

38

27

6 AWG*

C2N503/415D

415

52

37

4 AWG*

C2N363/400D

400

36

25

6 AWG*

C2N503/400D

400

50

35

4 AWG*

C2N363/380D

380

33

23

8 AWG*

C2N503/380D

380

47

31

4 AWG*

* Based on the NEC Table 310 .15 for 75°C insulated copper wire @ 30°C 
Ambient . Aluminum wire requires larger gauges .

WARNING Install product to rated line voltage in accordance to current local and national codes and 

regulations.

Not all available (optional) voltages are listed in table.

Содержание C2N363/600D

Страница 1: ...s C2N36 C2N50 Voltage options 600V 3 phase 480V 3 phase 415V 3 phase 400V 3 phase 380V 3 phase Table of Contents Pre Installation Information 2 3 Storage Instructions 3 Mounting Heater 4 Plumbing Inst...

Страница 2: ...result in serious burns or death Disconnect power supply before performing any work in the enclosure Failure to ground this system may result in death or serious injury Make sure that all water supply...

Страница 3: ...ing quick close valves or solenoid valves it is important to install a hammer arrestor or surge tank close to the point of use to absorb pressure spikes Installation Considerations Maximum operating p...

Страница 4: ...the vertical surface Vertical surface must support 150 lbs or more Optional Leg Kit Use the floor mounting template on the side of the crate to help with alignment Secure heater by bolting each leg t...

Страница 5: ...0 B 3 3 8 86 8 203 8 3 4 222 Optional Fused Disconnect Suggested Location for Power Entrance Provided By Installer LOAD L LOAD R READY TEST FAULT RESET GROUND FAULT TEMPERATURE CONTROLLER R 1 2 3 4 5...

Страница 6: ...tranded machine tool wire from an approved isolating 3 pole switch or circuit breaker NOTICE Make sure the electrical cable is the correct size to carry 100 of the full load current See table for prop...

Страница 7: ...f valve and drain Shutoff valve is installed after pressure and temperature relief valve on outlet if required by local or national plumbing codes If the hot water process is not at the highest point...

Страница 8: ...activate the connected process requiring heated water faucet shower etc then flush the system for 5 minutes to ensure all air is purged from the system NOTICE Failure to bleed air properly will damage...

Страница 9: ...output temperature Setpoint Down Button Decreases output temperature Infinity Key Back to Home page Advance Key Advances through parameter prompts Auto Man Off C r71 Turns Control Loop On Manual Off X...

Страница 10: ...lements if the inlet water temperature is equal to or greater than the temperature set on the digital controller Perform Operational Test No 2 8 A Turn on hot water faucet fixture process The heater s...

Страница 11: ...used disconnect interlocks with enclosure door when energized prohibiting access to a live cabinet Select the FDS option for an additional level of safety and convenience at the heater location T190 H...

Страница 12: ...ery 6 months or more often in areas where hard water sediment is present in the water To clean the Y Strainer 1 Turn the power off at the circuit breaker panel 2 Shut off the installer supplied cold w...

Страница 13: ...al Specifications table in Step 3 for proper requirements 2 Unit is receiving voltage from all 3 phases of the power source A load voltage reading is also helpful 3 Verify the functionality of the flo...

Страница 14: ...Purge gas compressed air inlet fitting here EXP2 Installation Notes 1 Any tubing conduit or fittings connected to the Pressurized Enclosure PE must conform to local codes for flammability ratings 2 A...

Страница 15: ...osure and the protective gas supply The alarm actuator shall be mechanical pneumatic or electrical Electrical alarms and electrical alarm actuators shall be approved for the location in which they are...

Страница 16: ...irements No valves may be fitted between the Expo Technologies system and the alarm switch WARNING Never turn on the power without purging first unless you have proved the interior of the PE is gas fr...

Страница 17: ...larms function correctly Check the Relief Valve and any other Spark Arrestors Remove any debris or corrosion or replace the Spark Arrestor Check the condition of the air supply filter element Clean or...