Basic settings and service procedures
BR/BD 100/250 R BP / RI
Page 116 / 171
Service Manual 08.2007
5.5 Replacement intervals
Component
Battery with crane or fork lift
Floor tool
Brush roller bearing
Brush rollers
Brush drive belt
Brush motor carbon brushes
Brush motor
Transmission (brush drive assembly)
Suction beam
Rubber strip
Suction motor
Water pump
Electrical water valve
Water filter
Fresh water tank, right
Fresh water tank
Dirty water tank
Fine dust filter in dirty water tank
Recycling filter in dirty water tank
Drain hose - fresh water or dirty water tank
Suction beam lifting motor
Seat switch
Driving motor
Drive controller
Steerer/steering column
Rear wheel
Brake drum (not including adjustments)
Brake cable each side
Brush head lifting motor
Replacement time
in minutes
30
60
5
5
15
35
45
30
5
10
30
20
30
10
15
360
60
10
10
5
20
5
40
20
50
10
30
30
90
Содержание BR 100 R
Страница 1: ...Service Manual 08 2007 5 906 252 0 BR BD 100 250 R RI BR BD 120 250 R RI 1 480 Service Manual ...
Страница 2: ...BR BD 100 250 R BP RI Page 2 171 Service Manual 08 2007 ...
Страница 153: ...BR BD 100 250 R BP RI Circuit diagrams Page 153 171 Service Manual 08 2007 8 1 Circuit diagram 0 088 734 0 Head CPU A1 ...
Страница 154: ...Circuit diagrams BR BD 100 250 R BP RI Page 154 171 Service Manual 08 2007 8 2 Circuit diagram 0 088 876 0 Head CPU A1 ...