BR/BD 100/250 R BP / RI
Basic settings and service procedures
Page 101 / 171
Service Manual 08.2007
5.3 Setup menu
5.3.5 Module parameter manufacture settings
Standard parameter setup menu
Adjustments must be made by service department for
accessory kits or upgrades!
Available for PRE-SWEEPER option
Available for SIDE BRUSH option
**) IMPORTANT: These values must be changed by the produc-
tion when using a faster or slower drive motor. The access and
values will be announced when the first model is built!!
.+) The adjustment limits given are maximum values. They are
mutually interdependent as follows: t_sweep_max = t_suction_min,
and t_suction_min = t_sweep_max. this ensures that the intake
fan always runs at least as long as the sweeper. Example: Setting:
t_brush_max = 3s -> Setting t_suction_min = 3s. Setting
t_suction_max = 2s -> setting of t_sweep_max = 2s.
PARAMETER-SETUP, sequence and factory settings BR 100/250R(I) - State 2005/05/20
Module
Parameter presentation in
display
Factory setting
min:step:max
Notes
max. speed:
M2/D-S:
40%
40%
15%:5%:70%
Slow nominal speed controller for downward
travel of brush lift motor in the pressure control
phase.
Order
Service
access
Development
access
1
X
Lift module (1),
Clone 1: Controls
for suction beam
+ scrubber head
Available in:
a) Basic unit
b) Basic unit +
side brush
c) Basic unit +
pre-sweeper
max. speed:
M2/U-S:
60%
60%
15%:5%:70%
Slow nominal speed of the speed controller during
upward travel brush lift motor in the pressure
control phase.
2
X
Clean module (2),
Clone 2: Control
of the pre-sweeper
Available in:
Basic unit + pre-
sweeper
CANNOT BE ADJUSTED!
max. speed:
M2/D-S:
20%
20%
15%:5%:70%
Slow nominal speed of the speed controller during
downward travel brush lift motor in the pressure
control phase.
1
X
Lift module (2),
Clone 2: Control
of lift motor pre-
sweeper and side
brush
Available in:
a) Basic unit +
side brush
b) Basic unit +
pre-sweeper
max. speed:
M2/U-S:
60%
60%
15%:5%:70%
Slow nominal speed of the speed controller during
upward travel brush lift motor in the pressure
control phase.
2
X
Acceleation number
#) Start up
##) Braking
0.8 m/s
2
1.1 m/s
2
1.0 m/s
2
1.3 m/s
2
1.2 m/s
2
1.5 m/s
2
1.4 m/s
2
1.7 m/s
2
1.9 m/s
2
1
2
3
4
1.6 m/s
2
5
Содержание BR 100 R
Страница 1: ...Service Manual 08 2007 5 906 252 0 BR BD 100 250 R RI BR BD 120 250 R RI 1 480 Service Manual ...
Страница 2: ...BR BD 100 250 R BP RI Page 2 171 Service Manual 08 2007 ...
Страница 153: ...BR BD 100 250 R BP RI Circuit diagrams Page 153 171 Service Manual 08 2007 8 1 Circuit diagram 0 088 734 0 Head CPU A1 ...
Страница 154: ...Circuit diagrams BR BD 100 250 R BP RI Page 154 171 Service Manual 08 2007 8 2 Circuit diagram 0 088 876 0 Head CPU A1 ...