
➤ Only a competent technician may carry out initial start-up.
Special measures for start-up after storage
Storage period
longer than
Action
12 months
➤ Change the Compressor Oil
➤ Have the motor bearings checked by an authorized KAESER Service Tech‐
nician.
36 months
➤ Have the overall technical condition checked by an authorized KAESER
Service Technician.
Tab. 32 Re-commissioning after storage
7.3 Checking installation and operating conditions
➤ Check and confirm all the items in the checklist before first start-up of the machine.
To be checked
See
chapter
Complied?
➤ Are the operators fully conversant with safety regulations?
–
➤ Have all the positioning conditions been complied with?
➤ Is a user-supplied lockable power supply disconnection device instal‐
led?
➤ Does the power supply conform to the specifications on the nameplate? 2.1
➤ Are the power supply cable conductor diameters and fuse ratings ad‐
equate?
➤ Have all electrical connections been checked for tightness?
➤ (Repeat check after 50 operating hours)
–
➤ Are the user's shut-off and check valves fitted to the compressed air
outlet?
➤ Is the connection to the air main made with a flexible hose?
➤ Sufficient oil in the crankcase?
(oil in the sight gauge red zone)
➤ The oil must be changed after 50 operating hours
➤ Is the user's motor protection device adjusted correctly with regard to
the engine power?
➤ Oil level monitor connected?
➤ Is the machine securely bolted to the floor or at the compressed air
tank?
➤ Are all access doors closed and latched and all removable panels in
place and secured?
(sound enclosure)
–
Tab. 33 Checklist of installation conditions
7
Initial Start-up
7.3
Checking installation and operating conditions
42
Assembly and operating manual 2-stage piston compressor
EPC-2-G
No.: 9_5753_04 E
Содержание EPC-2-G Series
Страница 2: ...Original instructions KKW PEPC 1 04 en SBA KOLBEN AGGREGAT 2 STUFIG ...
Страница 6: ...Contents iv Assembly and operating manual 2 stage piston compressor EPC 2 G No 9_5753_04 E ...
Страница 10: ...List of Tables viii Assembly and operating manual 2 stage piston compressor EPC 2 G No 9_5753_04 E ...