1. Open the shut-off valve to the air system.
2. Switch on the power supply disconnecting device.
The machine switches to LOAD and delivers compressed air.
➤ The machine should be observed during the first few hours in operation in order to detect
any faults.
After the first 50 operating hours, the following must be carried out:
■ Check that all electrical connections are secure.
■ Change the oil.
7.7 Measuring the air receiver filling time
Measuring the time the compressor takes to fill the air receiver when new can be useful in checking
the machine's performance at a later date.
Precondition Machine at operating temperature.
1. Close the shut-off valve to the air main.
2. Switch on the power supply disconnecting device.
3. Measure the air receiver charging time.
4. Enter the charging time, the receiver size and machine model in the table.
Machine model
Air receiver size (litres)
Receiver charging time from 3–
14.5 bar [min/s]
Tab. 34 Air receiver charging time
7
Initial Start-up
7.7
Measuring the air receiver filling time
44
Assembly and operating manual 2-stage piston compressor
EPC-2-G
No.: 9_5753_04 E
Содержание EPC-2-G Series
Страница 2: ...Original instructions KKW PEPC 1 04 en SBA KOLBEN AGGREGAT 2 STUFIG ...
Страница 6: ...Contents iv Assembly and operating manual 2 stage piston compressor EPC 2 G No 9_5753_04 E ...
Страница 10: ...List of Tables viii Assembly and operating manual 2 stage piston compressor EPC 2 G No 9_5753_04 E ...