The shipper has the option to ship either the front panel separately or to ship the front panel along with
the chassis. If the front panel arrives with the chassis, set aside the front panel box until you are ready to
verify the contents of the order.
To unpack the chassis (see
):
Figure 44: Shipping Crate and Accessory Box
1. Move the shipping box to a staging area as close to the installation site as possible. While the chassis
is bolted to the pallet, you can use a forklift or pallet jack to move it. Make sure there is enough space
to remove components from the shipping box.
2. Position the shipping box with the arrows pointing up.
129
Содержание MX10016
Страница 1: ...MX10016 Universal Routing Platform Hardware Guide Published 2019 10 15 ...
Страница 19: ......
Страница 86: ......
Страница 123: ......
Страница 153: ......
Страница 239: ...Figure 118 Moving the MX10016 Using a Mechanical Lift g100421 242 ...
Страница 240: ...5 CHAPTER Troubleshooting Hardware Restoring Junos OS 245 Alarm Messages 249 ...
Страница 241: ......
Страница 249: ......
Страница 277: ...Restricted Access Warning 281 ...
Страница 292: ...Jewelry Removal Warning 296 ...
Страница 295: ...Operating Temperature Warning 299 ...
Страница 304: ...DC Power Disconnection Warning 308 ...
Страница 308: ...DC Power Wiring Sequence Warning 312 ...
Страница 311: ...DC Power Wiring Terminations Warning 315 ...
Страница 320: ...Translation The emitted sound pressure is below 92 dB A per GR63 CORE 324 ...