Characterization of Installation Site
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•
JUNOSg 3.0 G10 CMTS Hardware Guide
76
Table 27: RF Plant/HFC Environment Characterization
Table 28 is provided to collect information regarding the existing DOCSIS services supported
by the installation site. If there are no existing DOCSIS services supported, skip Table 28 and
proceed to subsequent tables. If more than two DOCSIS services exist, additional tables are
provided in “Additional Characterization Tables” on page 85.
Parameter
Value
Plant architecture type
____ HFC ____ All Coax
Number of optical links within HFC
Distance between optical links within HFC
____ max ____ average
Amplifier cascade depth from node
____ max ____ average
Homes passed per node
____ max ____ average
Total homes passed by installation site
Node combining ratio per port
___:1 upstream ___:1 downstream
Average upstream noise measurement (see note below)
____ dB
Peak upstream noise measurement (see note below)
____ dB
Passive loss from upstream receiver to CMTS
____ dB
Maximum tap value used
____ dB
Maximum tap output level at highest frequency
____ dBmV
Maximum drop loss allowed from tap to home
____ dB
Method used for return path alignment
DOCSIS services offered? If yes, complete Table 28 on page 77.
____ yes ____ no
Upstream frequency spectrum utilization
(complete Table 31 on page 81)
We recommend that you take a sample of 10 percent of
the total nodes terminated at the installation site for
average and peak noise measurements using the
methodology described in “Noise Measurement
Methodology” on page 83.
Содержание G10 CMTS
Страница 8: ... JUNOSg 3 0 G10 CMTS Hardware Guide viii ...
Страница 18: ... JUNOSg 3 0 G10 CMTS Hardware Guide 2 ...
Страница 34: ...G10 CMTS Hardware Overview JUNOSg 3 0 G10 CMTS Hardware Guide 18 ...
Страница 46: ...DOCSIS Module JUNOSg 3 0 G10 CMTS Hardware Guide 30 Figure 12 DOCSIS Module Front Panel HotSwap ...
Страница 55: ... Hardware Component Overview Chassis Control Module 39 Figure 15 Chassis Control Module Front Panel Eth0 ...
Страница 72: ...Chassis Rear Modules JUNOSg 3 0 G10 CMTS Hardware Guide 56 Figure 21 Hard Disk Module Rear Panel C O M Eth ...
Страница 82: ... JUNOSg 3 0 G10 CMTS Hardware Guide 66 ...
Страница 112: ...Rack Mounting JUNOSg 3 0 G10 CMTS Hardware Guide 96 Figure 25 Air Flow Through Chassis ...
Страница 116: ...Rack Mounting JUNOSg 3 0 G10 CMTS Hardware Guide 100 Figure 29 Rack Fully Populated with Three G10 CMTS Chassis ...
Страница 118: ...Install Power Supplies JUNOSg 3 0 G10 CMTS Hardware Guide 102 Figure 30 Power Supply Installation 1 2 ...
Страница 138: ...Connect to Power Sources JUNOSg 3 0 G10 CMTS Hardware Guide 122 Figure 39 DC Power Transition Module ...
Страница 148: ... JUNOSg 3 0 G10 CMTS Hardware Guide 132 ...
Страница 156: ...Upstream RF Measurement JUNOSg 3 0 G10 CMTS Hardware Guide 140 ...
Страница 188: ... JUNOSg 3 0 G10 CMTS Hardware Guide 172 ...
Страница 196: ...Radio Frequency RF Specifications JUNOSg 3 0 G10 CMTS Hardware Guide 180 ...
Страница 202: ...EIA Channel Plans JUNOSg 3 0 G10 CMTS Hardware Guide 186 ...
Страница 203: ... 187 Part 5 Index Index on page 189 ...
Страница 204: ... JUNOSg 3 0 G10 CMTS Hardware Guide 188 ...
Страница 209: ... Index 193 Index V ventilation 69 89 95 101 124 161 162 167 video servers 7 voltage power supply 27 ...
Страница 210: ... Index JUNOSg 3 0 G10 CMTS Hardware Guide 194 ...