Ground the Chassis
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•
JUNOSg 3.0 G10 CMTS Hardware Guide
94
!
Connect to Power Sources on page 119
Ground the Chassis
Prior to rack mounting the G10 CMTS, you should install an earth ground strap on the chassis,
particularly if the sides of the chassis will be inaccessible after it is rack mounted. Figure 6 on
page 13 shows the location of the chassis ground nuts on the chassis. The G10 CMTS
accessory kit contains a two-ring lug connector that you must crimp to the ground strap.
Using two of the supplied #12 screws and washers (a washer is installed between each bolt
and the lug connector), attach the ground strap to the chassis using 35 in-lb of torque on each
screw. The other end of the ground strap will be attached to earth ground after the chassis is
rack mounted.
Rack Mounting
This section describes the process for rack mounting the G10 CMTS into an EIA standard
19-inch rack. The mounting brackets are compatible with either of the following racks:
!
Standard 1-3/4” EIA wide
1-1/4”, 1/2”, 1-1/4”
12-24 tapped
!
Standard 2” EIA wide
1”, 1”
12-24 tapped
The G10 CMTS is shipped from the factory with mounting brackets attached to the front of
the chassis for front-rack mounting. If the chassis is to be mid-rack mounted, you must
remove and reinstall the mounting brackets to the center of the chassis.
The following procedure assumes that all the contents of the shipping cartons, including the
G10 CMTS chassis, have been removed.
Never power on the G10 CMTS without first grounding the
chassis.
You must rack mount the G10 CMTS chassis prior to the
installation of any additional power supplies or modules.
Содержание G10 CMTS
Страница 8: ... JUNOSg 3 0 G10 CMTS Hardware Guide viii ...
Страница 18: ... JUNOSg 3 0 G10 CMTS Hardware Guide 2 ...
Страница 34: ...G10 CMTS Hardware Overview JUNOSg 3 0 G10 CMTS Hardware Guide 18 ...
Страница 46: ...DOCSIS Module JUNOSg 3 0 G10 CMTS Hardware Guide 30 Figure 12 DOCSIS Module Front Panel HotSwap ...
Страница 55: ... Hardware Component Overview Chassis Control Module 39 Figure 15 Chassis Control Module Front Panel Eth0 ...
Страница 72: ...Chassis Rear Modules JUNOSg 3 0 G10 CMTS Hardware Guide 56 Figure 21 Hard Disk Module Rear Panel C O M Eth ...
Страница 82: ... JUNOSg 3 0 G10 CMTS Hardware Guide 66 ...
Страница 112: ...Rack Mounting JUNOSg 3 0 G10 CMTS Hardware Guide 96 Figure 25 Air Flow Through Chassis ...
Страница 116: ...Rack Mounting JUNOSg 3 0 G10 CMTS Hardware Guide 100 Figure 29 Rack Fully Populated with Three G10 CMTS Chassis ...
Страница 118: ...Install Power Supplies JUNOSg 3 0 G10 CMTS Hardware Guide 102 Figure 30 Power Supply Installation 1 2 ...
Страница 138: ...Connect to Power Sources JUNOSg 3 0 G10 CMTS Hardware Guide 122 Figure 39 DC Power Transition Module ...
Страница 148: ... JUNOSg 3 0 G10 CMTS Hardware Guide 132 ...
Страница 156: ...Upstream RF Measurement JUNOSg 3 0 G10 CMTS Hardware Guide 140 ...
Страница 188: ... JUNOSg 3 0 G10 CMTS Hardware Guide 172 ...
Страница 196: ...Radio Frequency RF Specifications JUNOSg 3 0 G10 CMTS Hardware Guide 180 ...
Страница 202: ...EIA Channel Plans JUNOSg 3 0 G10 CMTS Hardware Guide 186 ...
Страница 203: ... 187 Part 5 Index Index on page 189 ...
Страница 204: ... JUNOSg 3 0 G10 CMTS Hardware Guide 188 ...
Страница 209: ... Index 193 Index V ventilation 69 89 95 101 124 161 162 167 video servers 7 voltage power supply 27 ...
Страница 210: ... Index JUNOSg 3 0 G10 CMTS Hardware Guide 194 ...