6.2.5
Calibrate sensor
Attention
The UV sensor must be calibrated prior to its first use and after about one week of
operation. It must also be calibrated after replacement of the UVC lamp and cleaning of
the quartz tube and/or UV sensor.
In the event of failure to comply, JUDO Wasseraufbereitung GmbH will not be
responsible for the resulting damage and/or malfunction. The operator alone bears the
risk!
The UV sensor should be used for at least 5 min. before calibrating it.
1
S e n s o r
C a l i b r .
Sensor Calibr.
→
UV sensor calibration (main menu)
Call up Sensor Calibration in the main menu.
Press Enter to access the Sensor Calibration menu.
2
C a l i b r .
O k
Calibrate voltage value (mV) detected by UV sensor to 100 % radiation
strength.
Press Enter to finalise calibration.
3
1 0 0 %
S e t
Display following calibration
(Voltage value
≙
Radiation strength 100%).
Exit Sensor Calibrate menu:
Press Enter.
Display switches to status display.
6.2.6
Reset countdown (lamp life display)
If the lamp needs replacing (e.g. if its defective or the lamp life has expired), the lamp life countdown must be
reset following lamp replacement.
The countdown must be reset prior to first use and following replacement of UVC lamp.
The quartz tube and UV sensor should be cleaned after every lamp replacement (see
Chap. 10.2 and 10.4).