Installation and operating instructions: JUDO UV disinfection system JUV 10-110 G/GS
All rights reserved.
JUDO Wasseraufbereitung GmbH
© JUDO Wasseraufbereitung GmbH
Postfach 380
D-71351 Winnenden
Translation into foreign languages and reproduction, even in excerpt form, is only permitted with special
approval.
Tel. +49 (0)7195-692-0
Fax +49 (0)7195-692-188
Revision level: 03.05.2017
E-mail: [email protected]
Internet: www.judo.eu
28
Unscrew the screw cap (Fig. 12) from the radiation chamber (
). Make sure not to lose the O-rings.
Carefully insert the quartz tube (Fig. 13) into the radiation chamber and centre it on the spring-
loaded guide (Fig. 14) on the floor of the radiation chamber.
Carefully place the O-ring (Fig. 15) over the quartz tube.
Adjust the screw cap on the quartz tube to create a fit close with the protective cap. Tighten the
screw cap by hand (
, approx. 5 Nm) to create a tight connection with the O-ring.
With the JUDO UV disinfection systems JUV 10-110 GS, screw the UV sensor in the
radiation chamber (see three steps below).
Unscrew (
) the connection plug from the UV sensor (Fig. 19) and remove.
Screw the UV sensor with the O-
ring into the internal thread (¼”) on the radiation chamber and
tighten by hand (
, approx. 5 Nm) using the installation tool provided.
Re-attach the connection plug to the UV sensor and tighten by hand (
).
Pressurise the radiation chamber and check all connection, the protective cap and quartz tube for
tightness.
Carefully guide the spacer (Fig. 20) and subsequently the UVC lamp (Fig. 18) into the quartz tube.
Connect the UVC lamp with the connection plug (Fig. 19) in accordance with the instructions, slide
the protective cover (Fig. 20) towards the radiation chamber as far as it will go and tighten the cable
connection.
Connect the protective conductor (Fig. 21) to the earth connection of the radiation chamber in
accordance with the instructions.