
Installing the KT-1-PCB
WARNING:
Route and secure all internal wiring using tie wraps or equivalent means to
ensure that the cables do not come into contact with the front cover of the metal enclosure.
Failure to do so may result in risk of physical injury to persons, or damage to or destruction
of property.
1.
Remove the main boards from the cabinet. If you leave the boards in place, disconnect the
power before you continue.
2.
Complete each of the required connections.
3.
Connect the 12 VDC power supply or, if you are using Ethernet, connect the PoE or PoE+ to
the RJ-45 connection.
4.
If you removed the boards at the beginning of the installation, replace them in the cabinet.
Figure 13: Installing the KT-1-PCB
Callout
Description
A
Backplate
B
Main boards
C
Front cover
Earth grounding
To ensure proper operation of the controller, ground the controller securely.
1.
Connect the ground wire to the green quick-connect terminal.
36
KT-1 One-Door Controller Installation Guide
Содержание Tyco KT-1
Страница 1: ...KT 1 One Door Controller Installation Guide D29008966R009 2021 03 08 DN2186 2103 ...
Страница 2: ......
Страница 8: ......
Страница 24: ...Figure 5 KT 1 PCB inputs and outputs 22 KT 1 One Door Controller Installation Guide ...
Страница 26: ...Figure 6 KT 1 controller with KT PS4085 power supply 24 KT 1 One Door Controller Installation Guide ...
Страница 29: ...Figure 8 KT 1 PCB EU inputs and outputs KT 1 One Door Controller Installation Guide 27 ...
Страница 56: ...KT 1 One Door Controller Installation Guide 54 ...