25
7
Commissioning
7.1
Notes before commissioning
Only qualifi ed personnel with a broad knowlege of the fi elds of electrical engineering, auto-
mation and drives are allowed to commission the stepper motor amplifi er ECOSTEP®54. If
required, Jenaer Antriebstechnik GmbH off ers trainings.
Th e manufacturer of the machine must generate a hazard analysis for the machine and take
appropriate measures to ensure that unforeseen movements cannot cause injury or damage
to any person or property.
Check the wiring for completeness, short circuits and ground fault.
All live parts must be protected safely against touching.
Never pull the connectors while they are live!
If there are several axes in one machine commission one axis aft er the other. Th e axes already
commisioned should be switched off .
During operation the temperature of the heat sink and the housing may rise up to over 70 °C.
Before touching these parts aft er switching off the unit wait until the temperature has fallen
down to 40 °C.
7.2
Control and display elements
At the front side of the ECOSTEP®54 4 LEDs are located which display status and error messages:
LED „24V“ (green) on: +24 V logic supply applied
LED „BUS“ (green), communication display: On, if the fi rst character of a telegram has been
received. Goes out as soon as the telegram is processed completely.
LED „RUN“ (green) fl ashes: soft ware running, stepper motor amplifi er ready for operation
LED „ERR“ (red) on: error message, cf. chap. 7.3, step 4.
Содержание ECOSTEP 54
Страница 1: ...User Manual ECOSTEP 54 ...
Страница 2: ......
Страница 4: ...User Manual ECOSTEP 54 4 Subject to change without notice ...
Страница 11: ...Subject to change without notice User Manual ECOSTEP 54 11 ...