![J&J Amusements King Scorpion Скачать руководство пользователя страница 182](http://html1.mh-extra.com/html/jandj-amusements/king-scorpion/king-scorpion_service-manual_3079425182.webp)
10-8
GO
-KARTS
B
U
MPERBOAT
S
Specifications subject to change without notice - Check our website for valuable information including videos, workshop and operations manuals. www.jjamusements.com
503-304-8899
ENDURANCE CL
UTCH PLA
TES
TM
Remove the throttle stop screw from the throttle
control on top of the engine. Place a couple of
drops of red thread locker on the front third of the
screw. Reinstall the throttle stop screw; it should
be turned in about a third of the way.
NOTE: Before adjusting the speed, make sure that
the rear wheels are off of the ground and secure
the chassis so the engine can be started and
accelerated to full speed.
Re-adjust the throttle cable so that there is a small
amount of free-play where the cable connects to
the pedal. Tighten the throttle cable lock nuts.
Recheck that the desired RPM/speed has not
changed.
Reinstall the air cleaner on the engine.
Lock nuts
Lock nuts
You can find a handy go-kart ratio analysis
calculator on our wbsite at http://www.
jjamusements.com/technical//speedcheck.htm,
or scan the code.
With a J&J Vortex gauge or a tachometer (where
you can see it), rev the engine up to full throttle.
Adjust the throttle stop screw until the engine is
set at the desired speed or RPM ( J&J recommends
17mph or 3650rpm). See page 6-29 for gearing &
speed setup.
NOTE: Rookie karts (Talon & Stinger) are set
to 3300 rpm at the factory. This translates to
approximately 12mph.
<WARNING>
All tracks are different. Track design
& operations will dictate the maximum safe speed.
Throttle stop
Содержание King Scorpion
Страница 31: ...0 25 TIP A great use for the shipping racks is to turn them into storage racks for your maintenance facity...
Страница 142: ......
Страница 174: ......