
7-26
GO
-KARTS
B
U
MPERBOAT
S
Specifications subject to change without notice - Check our website for valuable information including videos, workshop and operations manuals. www.jjamusements.com
503-304-8899
ENDURANCE CL
UTCH PLA
TES
TM
Re-assemble the brake drum/hub with the 7/16” jam
nuts and 5/32” Allen-head shoulder bolts.
Torque the bolts to 11 ft/lbs.
Slide the brake drum/hub assembly over the newly
installed brake shoes until the drum stops at the backing
plate. Pull the drum assembly out 1/16” from the
backing plate so the drum does not drag on the backing
plate.
Re-install the 5/16” Allen bolt into the hub and torque
to 50 ft/lbs.
Re-install the floater hub/drum assembly over the axle.
Secure the floater hub/drum assembly with the axle
collar and axle nut, and torque the axle nut to 50 ft/lbs.
Re-install any split collars that may have been removed.
Re-install the rear wheel.
REPLACEMENT BRAKE DRUMS AVAILABLE.
Rear brake drum # F030F01-43520-0
Содержание King Scorpion
Страница 31: ...0 25 TIP A great use for the shipping racks is to turn them into storage racks for your maintenance facity...
Страница 142: ......
Страница 174: ......