Additional connections
Any required sealing, flushing or cooling pipe connections must be installed. Please consult the data
sheet to see which pipes, pressures and amounts are necessary. The position and size of connections to
the pump are given in the appendix, "Connections".
NOTICE:
These connections are essential for the function.
It is recommended that a pipeline is installed to take off any leakage from the shaft seal. For connection,
see appendix, "Connections".
5.2.6 Additional connections
Any required sealing, flushing or cooling pipe connections must be installed. Please consult the data
sheet to see which pipes, pressures and amounts are necessary. The position and size of connections to
the pump are given in the appendix, "Connections".
NOTICE:
These connections are essential for the function!
It is recommended that a pipeline is installed to take off any leakage from the shaft seal. For connection,
see appendix, "Connections".
5.3 Drive
Note the Operating Instructions of the motor manufacturer.
On application in zone 1 and 2 a motor with valid Atex-certification must be used.
If in the process of the repair a new motor is used , the following has to be noticed:
•
The motor must comply with the requirements stated in sheet 1220.1A608 (order from manufactur-
er, on demand).
•
Clean motor end and motor flange of new motor carefully (remove varnish).
5.4 Final Control
It must be possible to turn the unit easily by hand at the stub shaft.