NOTICE:
Ensure that the pipe threads are clean. Apply thread sealant to the plugs and fittings. Failure to
do so may result in oil leaks and equipment damage.
NOTICE:
There are several methods used to install bearings. The recommended method is to use an
induction heater that heats as well as demagnetizes the bearings. Failure to use this method
may result in equipment damage.
1.
Prepare the bearing frame (228) as follows (see the illustration):
a) Install the oil-fill plug (113A).
b) Install the oil-drain plug (408A).
c)
Install the sight glass (319).
d) Install the sight oiler plug (408J).
e) Install the plug for the oil-cooler inlet (408L).
f)
Install the plug for the oil-cooler outlet (408M).
g) Install four oil-mist connection plugs (408H).
Or: Install two grease fittings (193) and two grease-relief plugs (113).
h) Attach the bearing-frame foot (241) and fasten the bolts (370F) by hand.
370F
241
408A
408L
319
228A
408W
113A
372T
761B
408W
408M
408N
Figure 106: Attach the bearing-frame foot
2.
Install the oil flinger (248A) onto the shaft (122).
NOTICE:
The oil flinger is press fitted onto the shaft. Use a properly sized driver. Failure to do so may
result in damage to the oil flinger.
3.
Place the bearing-clamp ring (253B) onto the shaft (122).
Make sure that the orientation of the bearing-clamp ring is correct.
4.
Install outboard bearings (112A) on shaft (122).
6.6 Reassembly
116
Model CV 3196 i-FRAME Installation, Operation, and Maintenance Manual
Содержание Goulds Pumps CV 3196 i-FRAME
Страница 1: ...Installation Operation and Maintenance Manual Model CV 3196 i FRAME ...
Страница 2: ......
Страница 171: ...9 1 Certificates of conformance Model CV 3196 i FRAME Installation Operation and Maintenance Manual 169 ...
Страница 174: ...9 1 Certificates of conformance 172 Model CV 3196 i FRAME Installation Operation and Maintenance Manual ...