168
361A
122
112
382
136
Figure 98: Inboard bearing reassembly
9.
Prepare the shaft for assembly as follows (see the illustration):
a) Install a new O-ring (496).
b) Coat the outside of the outboard bearing (112A) with oil.
c)
Coat the bore of the bearing housing (134) with oil.
d) Put the bearing housing (134) onto the shaft.
Do not use force.
e) Insert the bearing-retaining ring (361A) into the bore groove of the bearing housing (134).
NOTICE:
Ensure that the space between the ends of the retaining ring are located in the oil return
groove. Failure to do so will cause oil-flow obstruction and result in equipment damage.
Make sure that the shaft rotates freely.
f)
Install the outboard labyrinth oil-seal (332A) into the bearing housing (134).
Place the drain slots of the oil seal at the bottom position (6 o’clock).
Make sure that the edges of the keyway are free from burrs. To protect the O-ring, cover the keyway
lengthwise with a piece of electrical tape before you install the oil seal.
332A
134
112
361A
168A
496
Figure 99: Outboard labyrinth oil-seal reassembly
10. Install the shaft assembly into the bearing frame as follows (see the illustration):
a) Coat the outside of the bearing housing (134) with oil.
b) Coat all the internal surfaces of the bearing frame (228) with oil.
c)
Install the shaft assembly into the bearing frame (228).
6.6 Reassembly
Model CV 3196 i-FRAME Installation, Operation, and Maintenance Manual
111
Содержание Goulds Pumps CV 3196 i-FRAME
Страница 1: ...Installation Operation and Maintenance Manual Model CV 3196 i FRAME ...
Страница 2: ......
Страница 171: ...9 1 Certificates of conformance Model CV 3196 i FRAME Installation Operation and Maintenance Manual 169 ...
Страница 174: ...9 1 Certificates of conformance 172 Model CV 3196 i FRAME Installation Operation and Maintenance Manual ...