2. Pull the stator leads into the junction box through the cable-lead-trough in the stator housing.
3. Connect the leads to the terminal board as shown in appropriate cable chart.
Check the insulation for the connections with a Megger. The insulation between the phases and
between any phase and earth must be > 5 MΩ.
4. Assemble and fasten the cable entry.
Make sure that the gland screw bottoms out when fasten.
Cable entry for cables with the
outside diameter of 12–20 mm
(0.47–0.79 in.)
Cable entry for cables with the outside diameter of (20)–32
mm ((0.79)–1.26 in.)
5. Lubricate and fit the O-ring on the bearing holder.
Push it down to the oil housing bottom.
Maintenance (Continued)
36
Flygt 3102 Service and Repair Instructions
Содержание Flygt 3102
Страница 1: ...Water Wastewater Service and Repair Instructions Flygt 3102...
Страница 2: ......
Страница 67: ...Figure 13 3201 170 Technical Reference Continued Flygt 3102 Service and Repair Instructions 65...
Страница 68: ...Figure 14 3201 180 3201 185 Technical Reference Continued 66 Flygt 3102 Service and Repair Instructions...
Страница 71: ......