TJ75
50
Attaching Implements
CAUTION: Always use POSITION CONTROL
to attach/detach implements to provide
precise control of hitch.
FIG. 5-29:
Back Tractor to implement, centering Tractor
with implement hitch frame.
Raise or lower hitch using position control lever, 1, and
align left lower link end with corresponding implement
attaching pin.
Lock the brakes, shut off engine and remove key.
FIG. 5-30:
Slide ball end of left lower link, 1, over
implement pin and secure with linch pin.
Adjust height of right lower link using leveling crank,2.
Attach and secure right lower link, 3, to implement with
linch pin.
Attach top link, 4, to top of implement hitch frame using
pin supplied with Tractor. Rotate center barrel section of
top link, to lengthen or shorten it, and level implement
from front to rear.
After the implement is attached, it can be readjusted for
level operation using turn buckle and top link. Secure all
adjustments.
IMPORTANT: With some mounted implements, it will
be necessary to remove drawbar at rear
of Tractor to permit implement to be
raised and lowered without obstruction.
FIG. 5-31:
Certain implements require minimal side-
play. Check chain 1, at each lower link should be evenly
adjusted to reduce side-play to desirable level. Do not
remove all side-play as lower link damage may result.
NOTE: The amount of side-play (stabilizer looseness)
is dependent upon implement and type of
operation. Normally 2 (50mm) of total side
movement is desired, 1 (25mm) to each side of
Tractor centerline.
FIG. 5-29
1
FIG. 5-30
1
4
2
3
FIG. 5-31
Содержание TJ75
Страница 1: ...TJ75 MODEL I S E K I T R A C T O R S ...
Страница 65: ...TJ75 64 POWER OUTLET SUPPLY ...
Страница 114: ...WIRING HARNESS CABLE 113 WIRING HARNESS CABLE WIRING HARNESS MAIN ...
Страница 115: ...WIRING HARNESS CABLE 115 WIRING HARNESS ELC ...
Страница 116: ...WIRING HARNESS CABLE 117 WIRING HARNESS CAB ...