ASSEMBLY & PRE-DELIVERY INSPECTIION
111
FACTORY RECOMENDED
NEW TRACTOR PRE-DELIVERY INSPECTION CHECK LIST
ISEKI
USER'S NAME
AREA
DATE
DEALER
ADDRESS
TRACTOR MODEL
SERIAL NO.
ENGINE SERIAL NO.
COUNTRY
THIS PRE-DELIVERY INSPECTION CHECK LIST IS PROVIDED TO IDENTIFY THE CHECKED AND NECESSARY
ADJUST BY THE DEALER PRIOR TO DELIVERY OF THIS MACHINE.
Inpsected the following and adjusted if necessary.
ENGINE
□
Radiator filled with solution
□
Engine RPM (full throttle)
□
Cooling system connections
□
Governor performance
□
Fan and alternator belt tension
□
Electrical connections
□
Engine oil
□
Service air cleaner
□
All oil drain plugs
□
All cleaner connections
□
Oil pressure
□
Fuel line connections
□
Engine RPM (idle)
□
Injection pump oil
CHASSIS
□
Tyre inflation
□
Hydraulic system performance
□
Front wheel hub bolts
□
Drive test
□
Rear wheel hub bolts
□
Lubricate all grease fittings
□
Torque all chassis bolts
□
Power-assisted streering operation (if equipped)
□
Transmission oil
□
Front axele oil (4-WD)
□
Front reduction case
□
Front axele operation (4-WD)
□
Break pedal free-play
□
Operation manual with tractor
□
Clutch pedal free-play
Explained the following to the owner.
□
Operation manual
□
Fuel system servicing and cleanliness
□
Safety and safety start system
□
Draining of engine and radiator
□
Instruments and controls
□
Air cleaner service
□
Breaking in the new tractor
□
Tyre care
□
Power take-off operation
□
Wheel tread adjustment
□
Lubrication and maintenance schedule
□
Storage
□
Explain use of Rollover Protective Structure (ROPS)
Содержание TJ75
Страница 1: ...TJ75 MODEL I S E K I T R A C T O R S ...
Страница 65: ...TJ75 64 POWER OUTLET SUPPLY ...
Страница 114: ...WIRING HARNESS CABLE 113 WIRING HARNESS CABLE WIRING HARNESS MAIN ...
Страница 115: ...WIRING HARNESS CABLE 115 WIRING HARNESS ELC ...
Страница 116: ...WIRING HARNESS CABLE 117 WIRING HARNESS CAB ...