
47
INS
TALLER
U
SER
M
AINTEN
AN
CE
TECHNI
CI
AN
TECHNI
CAL
D
AT
A
Pump release.
If after a long period of inactivity, the circulator is blocked, adjust the screw in the centre of the head in order to manually release the mo-
tor shaft.
Take great care during this operation to avoid damage to the motor.
Bypass Adjustment (Parag. 1.34).
The boiler leaves the factory with the bypass open.
If necessary, the by-pass can be regulated to system requirements from minimum (by-pass closed) to maximum (by-pass open).
Adjust using a flat head screwdriver, turn clockwise and open the by-pass, anticlockwise it is closed.
The bypass ensures minimum circulation of the water in the boiler and correct operation of the appliance in case of systems
with shut-off components or external hydraulic adjustments.
Содержание VICTRIX ZEUS SUPERIOR 25
Страница 34: ...34 Installer User Maintenance technician Technical Data C93 X 27 ...
Страница 127: ...127 ...