
P
e
rf
o
rm
a
P
re
-R
u
n
C
h
e
c
k
cBot 2 System Guide
39
Perform a Pre-Run Check
The pre-run check reads the instrument sensors to detect the correct installation of run
components, and then performs a flow check using bubble sensors to detect air in the tubes.
If the lid was opened after the Manifold screen, the pre-run check also rescans consumables
and verifies that the consumable IDs match the initial scan.
The pre-run check takes approximately 3 minutes.
1
After successful completion of the pre-run check, select
Start
.
The Run Status screen opens and the run begins.
Run Component Errors
If the pre-run check fails due to errors related to run components or the lid being opened,
perform the following steps:
1
Check any run component with an indicated error to make sure that it is present and
loaded correctly.
2
Select
Rerun Check
to repeat the check.
3
If the check continues to fail, select
Cancel Run
to end the run and set up a new one.
Flow Check Failure
Flow check failure might be the result of an improperly loaded flow cell, a faulty manifold,
or a clog in the lines. Before bypassing the flow check, see
Содержание cBot
Страница 4: ...iv Material 20004364 Document 15065681 v01 ...
Страница 16: ...10 Material 20004364 Document 15065681 v01 ...
Страница 22: ...16 Material 20004364 Document 15065681 v01 ...
Страница 66: ...60 Material 20004364 Document 15065681 v01 ...
Страница 76: ...70 Material 20004364 Document 15065681 v01 ...
Страница 88: ...Index 82 Material 20004364 Document 15065681 v01 ...