P
P
a
a
g
g
e
e
2
2
0
0
Where heating/cooling devices are employed, the heating/cooling media
should be circulated 15-20 minutes prior to pump start-up and should be
allowed to continue for a similar period of time after the pump has been
shut down.
Where a CIP cycle is employed as part of the process, the
heating/cooling media should continue to be circulated during the cleaning
cycle.
Fig 8 Dimensions for Heating/Cooling.
Dimensions in Millimeters
A6
M1
A7
M2
A8
RTP20/0100/10
80
79
N/A
N/A
45
RTP30/0128/12
108
86
82.5
51
N/A
Dimensions in Inches
A6
M1
A7
M2
M2
RTP20/0100/10
3.14
3.11
N/A
N/A
1.77
RTP30/0128/12
4.25
3.39
3.25
2.01
N/A
* BSP Ports fitted as standard.
A
6
A
6
1/2" PORTS
M1
M2
A
7
A
7
1/8" PORTS
(INLET / OUTLET)*
1/8" PORTS
(INLET / OUTLET)*
1/2" PORTS
A
6
A
6
RTP20/0100/10
RTP30/0128/15
A8
Содержание Wright Flow Technologies RTP Series
Страница 1: ...P Pa ag ge e 0 0 INSTALLATION OPERATION AND MAINTENANCE MANUAL FOR THE RANGE OF PUMPS...
Страница 47: ...P Pa ag ge e 4 46 6 5 0 Specifications 5 1 Clearance Chart B A C Radial D C Radial...
Страница 51: ...P Pa ag ge e 5 50 0 B B 100 mm or 4 PORT 80 mm or 3 PORT 5 5 RTP30 Foundation Dimensions Stub Shaft Drive...
Страница 54: ...P Pa ag ge e 5 53 3 5 6 Typical Basic Pump Build RTP20 Shown...
Страница 56: ...P Pa ag ge e 5 55 5 5 8 RTPTM Service History Pump Serial No Date Comments...