![icetro IC-0170A Скачать руководство пользователя страница 58](http://html1.mh-extra.com/html/icetro/ic-0170a/ic-0170a_technicians-handbook_610584058.webp)
Harvest Sequence
5. Harvest
With the water pump de-energized, the dump valve and
hot gas valve are energized. The refrigerant gas warms
the evaporator causing the cubes to slide, as a sheet, off
the evaporator and into the storage bin.
After a 30 second water purge, the dump valve is de-
energized and the water inlet valve is energized to fill the
water trough until the float switch(s) are satisfied.
The sliding sheet of cubes opens the ice damper and bin
switch.
The momentary opening and re-closing of the bin switch
terminates the harvest sequence and returns the ice
machine to the freeze sequence.
NOTE: The maximum harvest time is 5 minutes. If the bin
switch does not activate within 5 minutes, 3 consecutive
times, the machine will stop and the power light will flash.
57
Содержание IC-0170A
Страница 1: ...Undercounter Ice Machines Technician s Handbook Revision Date 1 24 22...
Страница 2: ......
Страница 14: ...THIS PAGE INTENTIONALLY LEFT BLANK...
Страница 17: ...16 How to Read a Serial Number Full Serial Number...
Страница 154: ...WU 0100 WIRING DIAGRAM Self Contained Air cooled 153...
Страница 155: ...IC 0170 IU 0170 IC 0220 IU 0220 WIRING DIAGRAM Self Contained Air cooled 154...
Страница 156: ...Printed Circuit Bards PCB WU 0100 PCB 155...
Страница 161: ...SPACE FOR TECHNICIAN S NOTES...
Страница 162: ...SPACE FOR TECHNICIAN S NOTES...
Страница 163: ...SPACE FOR TECHNICIAN S NOTES...
Страница 164: ...SPACE FOR TECHNICIAN S NOTES...
Страница 165: ......