REPLACING PRESSURE CONTROLS WITHOUT
REMOVING REFRIGERANT CHARGE
This procedure reduces repair time and cost. Use it when
any of the following components require replacement, and
the refrigeration system is operational and leak-free.
• High pressure cut-out control
• High side access valve
• Low side access valve
1.
Disconnect power to the ice machine.
2.
Follow all manufacturers’ instructions supplied with
the pinch-off tool. Position the pinch-off tool around
the tubing as far from the pressure control as
feasible
.
Clamp down
on the tubing until the pinch-
off is complete.
n
Warning
Do not unsolder a defective component. Cut it out of
the system. Do not remove the pinch-off tool until the
new component is securely in place.
3. Cut the tubing of the defective component with a
small tubing cutter.
4. Solder the replacement component in place. Allow
the solder joint to cool.
5. Remove the pinch-off tool.
6. Re-round the tubing.
NOTE: The pressure controls will operate normally once
the tubing is re-rounded. Tubing may not re-round 100%.
14
7
Содержание IC-0170A
Страница 1: ...Undercounter Ice Machines Technician s Handbook Revision Date 1 24 22...
Страница 2: ......
Страница 14: ...THIS PAGE INTENTIONALLY LEFT BLANK...
Страница 17: ...16 How to Read a Serial Number Full Serial Number...
Страница 154: ...WU 0100 WIRING DIAGRAM Self Contained Air cooled 153...
Страница 155: ...IC 0170 IU 0170 IC 0220 IU 0220 WIRING DIAGRAM Self Contained Air cooled 154...
Страница 156: ...Printed Circuit Bards PCB WU 0100 PCB 155...
Страница 161: ...SPACE FOR TECHNICIAN S NOTES...
Страница 162: ...SPACE FOR TECHNICIAN S NOTES...
Страница 163: ...SPACE FOR TECHNICIAN S NOTES...
Страница 164: ...SPACE FOR TECHNICIAN S NOTES...
Страница 165: ......