background image

Table 13. (continued)

Myrinet switch

172.20.10.1

myri001

First iTouch port server

172.30.20.1

ts001

Second iTouch port server

172.30.20.2

ts002

RSA cards (bottom card)

172.30.30.1

rsa001

RSA cards (next card)

172.30.30.2

rsa002

RSA cards (Myrinet switch)

172.30.30.3

Cisco 4003 switch (console
management)

172.30.80.1

cisco4003–001

Cisco 10/100 switch

172.30.40.1

cisco3550–001

Cisco GB switch

172.30.50.1

cisco3508–001

APC Masterswitch

172.20.60.1

apc001

Remote Console Manager

172.30.70.1

rcm001

Ping failure on all nodes on both networks:

If all nodes on both networks

experience a ping failure, it indicates a problem with the system software or a user
application.

1.

Attempt to telnet to the node via the serial console.

a.

If telnet succeeds, check the

syslog

for errors.

1)

If there are errors, go to “Isolating software problems” on page 69 for
software problem resolution.

2)

If there are no errors, it indicates a user application problem.

b.

If telnet fails, try using a serial communications program like
Hyperterminal to connect to the node. If you still can not connect it
indicates a node hardware problem. Go to “Isolating hardware problems”
for problem resolution.

Table 14. Network troubleshooting for a cluster with two networks

Symptom

Action

1.

Cannot ping a node or nodes on the
cluster network from the Management
Node, yet therconsole command and
access from the KVM work correctly.

1.

Use the ifconfig command to verify that
the IP settings are correct.

2.

Verify that the cables are fully plugged
into the switch and node, and that
everything is plugged into the correct
port. Refer to the cabling information
printed on each cable label and“VLAN
options” on page 17if 
you are unsure
where a cable belongs. Verify that the
link lights are on.

3.

Swap ports on the Ethernet switch with a
Cluster Node port you know is working.

4.

Verify the Ethernet switch port is
configured for the Management VLAN.

Isolating hardware problems

Node checks

Table 15. Troubleshooting the remote console network

Symptom

Action

Chapter 10. Hardware/software problem determination

63

Содержание System Cluster 1350

Страница 1: ...eServer Cluster 1350 Cluster 1350 Installation and Service IBM...

Страница 2: ......

Страница 3: ...eServer Cluster 1350 Cluster 1350 Installation and Service IBM...

Страница 4: ...ries Your international Access Code 1 845 432 9405 IBMLink United States customers only IBMUSM10 MHVRCFS Internet e mail mhvrcfs us ibm com If you would like a reply be sure to include your name addre...

Страница 5: ...stribution of Linux 36 Installing Red Hat Linux 7 3 or 8 37 Installing SuSE Linux 8 or 8 1 39 Installing SuSE Linux Enterprise Server SLES 7 or 8 42 Install Cluster Systems Management CSM 44 Pre insta...

Страница 6: ...101 Installation procedure 101 Remove the rails from the cabinet 101 Remove the Cisco Gigabit Switch from the rails 101 Install the Cisco Gigabit Switch and rails into the cabinet 101 Configure and se...

Страница 7: ...Federal Communications Commission FCC statement 144 Industry Canada Class A emission compliance statement 144 Australia and New Zealand Class A statement 144 United Kingdom telecommunications safety...

Страница 8: ...vi Installation and Service...

Страница 9: ...of the cabinet 83 12 Mount switch rails to the Cisco 24 port 10 100 Switch 94 13 Install switch rails from the rear of the cabinet 95 14 Mount switch rails to the Cisco 48 port 10 100 Switch 97 15 Ins...

Страница 10: ...viii Installation and Service...

Страница 11: ...22 9 Type 6 VLAN with multiple Cisco 400x switches 23 10 Cluster 1350 supported software and firmware versions June 2003 35 11 Troubleshooting the shared VLAN 60 12 Network troubleshooting for a clus...

Страница 12: ...x Installation and Service...

Страница 13: ...e of this document do not perform any procedures until you receive a translated copy IBM does not accept responsibility or liability for failure to follow these procedures correctly Safety Information...

Страница 14: ...mation book For example if a caution statement begins with a number 1 translations for that caution statement appear in the IBM NetBAY Rack Safety Information book under statement 1 Be sure to read al...

Страница 15: ...e one hand only to connect or disconnect signal cables v Never turn on any equipment when there is evidence of fire water or structural damage v Disconnect the attached power cords telecommunications...

Страница 16: ...the rack cabinet and are easily accessible v Each rack cabinet might have more than one power cord Be sure to disconnect all power cords in the rack cabinet before servicing any device in the rack cab...

Страница 17: ...hest position v Ensure that there is no stabilizer bracket installed on the rack cabinet v Do not use a ramp inclined at more than ten degrees v Once the rack cabinet is in the new location do the fol...

Страница 18: ...tteries in communication adapters The batteries must be recycled or disposed of properly Recycling facilities might not be available in your area In the United States IBM has established a collection...

Страница 19: ...Part 1 Introduction to Cluster 1350 Chapter 1 System overview 3 Related Topics 9 Copyright IBM Corp 2003 1...

Страница 20: ...2 Installation and Service...

Страница 21: ...Management Node and console monitor Expansion cabinets may contain Storage Nodes or mass storage devices as well as computing nodes called Cluster Nodes Expansion cabinets do not contain a Management...

Страница 22: ...00 Mb Ethernet Switch Port Server Power Management Module 12 11 10 9 8 7 6 5 4 3 2 1 16 15 14 13 Cluster Nodes x335 22 21 Cluster Nodes x335 23 17 18 24 25 26 27 28 29 30 31 32 33 34 20 19 Figure 1 Ex...

Страница 23: ...0 99 98 97 96 91 90 89 Cabinet 3 506 505 504 503 502 501 500 499 498 497 496 495 Blank Blank Blank Blank Blank Blank Blank Blank 510 509 508 507 Cabinet 14 92 Power Management Module 33 34 36 37 38 35...

Страница 24: ...ich provides system management for all modules in the cluster The Cluster 1350 Management Node is an IBM eServer xSeries 345 x345 running a supported Linux distribution 24 Cl1350pi3 26 25 23 12 11 10...

Страница 25: ...ver in the cluster controls up to sixteen IBM EXP700 Disk Storage Expansion Units each of which expands the capacity of the Storage Server by fourteen disk drives Another mass storage solution is the...

Страница 26: ...requires a Myrinet PCI adapter in each Cluster Node and Storage Node The Myrinet Switch uses an optical cable High Speed Cisco Ethernet Switch copper The Cluster 1350 can also use the Cisco Catalyst 4...

Страница 27: ...345 Installation Guide ftp ftp pc ibm com pub pccbbs pc_servers_pdf 48p9726 pdf xSeries 345 User s Guide ftp ftp pc ibm com pub pccbbs pc_servers_pdf 48p9717 pdf xSeries 345 Hardware Maintenance Manu...

Страница 28: ...ion http www apcc com support kbase cfm v Cisco 10 100 MB and 1 GB Ethernet switches General Product information http www cisco com univercd cc td doc product lan Catalyst 3550 Series XL Hardware Inst...

Страница 29: ...3 Related topics 33 Chapter 6 Software installation 35 Software Version Matrix 35 Download link for drivers and firmware 36 Install a supported distribution of Linux 36 Installing Red Hat Linux 7 3 or...

Страница 30: ...12 Installation and Service...

Страница 31: ...of the normal setup process __ 4 Using the order placed for the system identify the Primary cabinet and verify its contents If equipment was removed prior to shipping check the Bill of Materials to en...

Страница 32: ...14 Installation and Service...

Страница 33: ...their approximate final location Each cabinet is labeled to help in this process The IBM Service team will take care of final cabinet placement and perform the rest of the cabling and installation st...

Страница 34: ...ck frame Do not extend or exchange any rack mounted units when the stabilizer is not installed Take the following steps to finish placing the cabinets __ 1 Inspect the cabinets components and cable co...

Страница 35: ...et trunk line shared with the management VLAN for certain VLAN types only This serves as a high speed trunk line for all Ethernet communications within the cluster Optional Secondary Cluster VLAN Prov...

Страница 36: ...co 3550 Storage Nodes Ethernet 2 connects to Cisco 3550 Ethernet 1 connects to Cisco 3508 GBIC FAStT200HA Connects to Cisco 3550 Uses both jacks FAStT700 Connects to Cisco 3550 Uses both jacks Table 2...

Страница 37: ...nects to Cisco 4003 Gbit Fiber GBIC connects to Sup III uplink iTouch port server Connects to Cisco 3550 APC switch Connects to Cisco 3550 Cisco 3550 10 100 switch Copper GBIC connects to Cisco 3508 C...

Страница 38: ...ter Storage Nodes Ethernet 2 connects to Cisco 3550 Ethernet 1 connects to copper Cisco 3508 GBIC Myrinet adapter FAStT200HA Connects to Cisco 3550 FAStT700 Connects to Cisco 3550 Table 5 Type 5 VLAN...

Страница 39: ...vice Management VLAN Gbit Primary Cluster VLAN Myrinet customer public high speed VLAN Management Node v Ethernet 1 Alias connects to Cisco 400x v Ethernet 2 connects to Sup I or Sup III v Ethernet 1...

Страница 40: ...onnects to Cisco 400x Storage Nodes Ethernet 2 connects to Cisco 3550 Ethernet 1 connects to Cisco 400x FAStT200HA Connects to Cisco 3550 Uses both jacks FAStT700 Connects to Cisco 3550 Uses both jack...

Страница 41: ...tomer public high speed VLAN Management Node Ethernet 2 connects to Cisco 3550 Ethernet 1 connects to Cisco 3508 copper GBIC Fiber Channel PCI connects to public network KVM switch Connects to Cisco 3...

Страница 42: ...to each Expansion cabinet and use the information printed on each cable label to properly attach the cables found there Once you have reattached any cables in the Primary cabinet and Expansion cabine...

Страница 43: ...shows a schematic of the Myrinet optical cabling in a large cluster VLAN types 2 5 and 6 would follow this model ATTENTION All intercabinet cables have labels at both ends of each cable You can use t...

Страница 44: ...6 shows a schematic of the cabling in a large cluster VLAN types 2 3 5 and 6 would follow this model ATTENTION All intercabinet cables have labels at both ends of each cable You can use the informati...

Страница 45: ...8 on page 28 shows a schematic diagram of Fibre Channel Cabling in a large cluster ATTENTION All intercabinet cables have labels at both ends of each cable You can use the information on the label to...

Страница 46: ...x335s can be daisy chained onto a single KVM switch port up to 40 cluster nodes But the Management Node and all the Storage Nodes each require a separate KVM switch port Certain systems may require a...

Страница 47: ...d all the Storage Nodes may also be daisy chained with up to sixteen per ACT port Multiple RCMs may not be daisy chained together The RCM may be connected to an Ethernet network to allow for remote ac...

Страница 48: ...Use a wire tie to attach the cable to the harness that contains the defective cable This identifies the replacement cable as belonging to this harness 4 Label the replacement cable so it is clearly id...

Страница 49: ...all outlet or other appropriate receptacle d Turn on the breaker switch for the customer s source power e Ensure the PDU circuit breakers are turned on 6 Verify that all internal PDUs are powered up b...

Страница 50: ...Primary cabinet Power on the following devices in the order listed 1 Storage Expansion Units v Flip the circuit breakers on the back of the device to the ON position 2 Storage Controllers v Flip the c...

Страница 51: ...stem appears to be functionally sound IBM will turn control over to the party installing the software Lights out or brown out The following sequence should occur in a lights out scenario 1 The system...

Страница 52: ...34 Installation and Service...

Страница 53: ...rienced with Red Hat Linux DHCP NFS and Linux networking and administration Software Version Matrix The Cluster 1350 requires certain levels of a supported Linux distribution and Cluster System Manage...

Страница 54: ...00 x345 BIOS ISMP Diagnostics Remote Supervisor Adapter F W v1 08 v1 04 v1 04 v1 17 x360 BIOS Diagnostics Remote Supervisor Adapter F W v1 08 v3 01 v1 08 ServeRAID Driver 6 10 20 Download link for dri...

Страница 55: ...er and save your configuration changes Exit the configuration utility You will get a message that the drives are resynching 3 Insert the Red Hat 7 3 Linux product CD and restart the Management Node 4...

Страница 56: ...on your system 11 Set the root account password 12 Create an admin account to log into after installation is complete 13 When prompted to select the packages you want installed during the installation...

Страница 57: ...ith the following lines search clusters com any other site specific domains nameserver 172 20 0 1 6 Populate the var named directory using the named files found on the diskette shipped with the Cluste...

Страница 58: ...K 6 Select Partitioning then Discard and then Custom Partitioning You will manually partition the drive First delete all the partitions on sda Create the following partitions v A boot partition with a...

Страница 59: ...r create the etc sysconfig network ifcfg eth2 file and customize it with site specific network information It should contain the same directives as ifcfg eth1 4 Update the etc resolv conf file with th...

Страница 60: ...0 to primary and drive 1 to secondary Press ESC and then Enter and save your configuration changes Exit the configuration utility You will get a message that the drives are resynching 3 Insert the SuS...

Страница 61: ...e latest level kernel available Update the configuration files Now that the Management Node can communicate with other devices in the cluster take the following steps 1 Update etc modules conf with th...

Страница 62: ...8 Enable the named dhcpd and NFS services by issuing the following command chkconfig nfsserver on chkconfig named on chkconfig dhcpd on 9 Reboot the Management Node by issuing the following commands s...

Страница 63: ...wnload the merge ic sh script from http publib boulder ibm com cluster 1350downloads htm and place the script in the tmp directory Issue the following command merge ic sh tarfile 1 tarfile 2 tarfile 3...

Страница 64: ...csmdriverdownload html 7 Issue the command rpower a query and check that a valid status either on or off is returned for each node defined 8 Issue the command rconsole a to check that you have valid C...

Страница 65: ...ias scsi_hostadapter2 qla2x00 must be the last SCSI host adapter listed in the file If there are other SCSI host adapter boards installed on your system and the scsi_hostadapter alias is used define a...

Страница 66: ...l nodes in the cluster Because of the way the Red Hat 7 3 and 8 loads SCSI drivers and assigns them to dev sda dev sdb and so on problems can result if more than one SCSI host adapter board Adaptec or...

Страница 67: ...configuration This can be done by using the fdisk l command 3 If present configure the modem according to the manufacturer s instructions 4 The system is now ready for the customer to connect their ne...

Страница 68: ...50 Installation and Service...

Страница 69: ...des a powerful way to administer the daily operations of a Cluster 1350 For more information on such topics as Overview Monitoring Remote Control Set up and Technical Reference refer to http www ibm c...

Страница 70: ...52 Installation and Service...

Страница 71: ...installed or when network access to the servers is not available or failed The terminal servers are required by the Install function in CSM and must be included to enable the Remote console function E...

Страница 72: ...54 Installation and Service...

Страница 73: ...following devices have no power switch and must be unplugged if the PDUs are not powered down v KVM Switch v Cisco 10 100 Switch v Cisco Gigabit Switch v iTouch terminal server 4 Unplug the PDUs from...

Страница 74: ...56 Installation and Service...

Страница 75: ...nstall the console switch and rails into the cabinet 81 Configure and setup the console switch after device replacement 84 Upgrading the console switch FLASH level 84 Replacement of NetBAY Advanced Co...

Страница 76: ...0 Power Management Module replacement and configuration 111 Replacement 111 Uncable the Power Management Module 111 Remove the tray from the cabinet 111 Remove the Power Management Module from the tra...

Страница 77: ...y be an x335 or BladeCenter containing at least four Blade servers The nodes are configured to execute customer applications or provide other services required by the customer such as file server netw...

Страница 78: ...the node is connected For the service processor network the output includes the hostname of the Falcon card to which the node is connected and the internal service processor name for the node CSM dis...

Страница 79: ...interface card If following the steps in Table 11 on page 60 did not correct the problem continue with the steps shown in Cluster with one network Cluster with one network Ping failure on one or some...

Страница 80: ...ems on page 69 for software problem resolution 2 If there are no errors it indicates a network problem Go to Table 14 on page 63 and continue with the steps shown there b If telnet fails it indicates...

Страница 81: ...blem b If telnet fails try using a serial communications program like Hyperterminal to connect to the node If you still can not connect it indicates a node hardware problem Go to Isolating hardware pr...

Страница 82: ...ainst ports that are working correctly 4 Verify the InReach terminal server is powered up and functional by pinging the unit at 172 30 20 1 5 Ensure the serial port COM 1 is configured to redirect out...

Страница 83: ...n node Service processor log may be full The log is cleared by connecting to the service processor via the Falcon card Otherwise go to Node on page 72 for node problem determination rpower to node fai...

Страница 84: ...7 Verify the 10 100 ethernet link from the RSA card to the Cisco 3550 or 400x switch 8 Flash the ASM to the latest firmware level 9 Flash the RSA to the latest firmware level 10 Check RSA configuratio...

Страница 85: ...check that the adapter device driver is configured If the adapter device driver is configured go to Storage on page 73 and continue with storage subsystem problem determination If the adapter device...

Страница 86: ...igured to redirect output to the terminal server Take the following steps v Restart the node and watch the monitor screen v When the message Press F1 for Configuration Setup appears press F1 v From th...

Страница 87: ...ad cables 6 Reboot the failing node s to reset connection to the KVM switch File system failure Check disks using fdisk l v If fdisk l completes go to GPFS on page 72 and continue with the file system...

Страница 88: ...ls ctrmc shows that RMC is not running on the management server Follow problem determination section in Monitoring HOWTO located at http www 1 ibm com servers eserver clusters library csmadm html lsrs...

Страница 89: ...llowing Myrinet software packages are required v GM software This is the base software required to use Myrinet 2000 network It is the message passing system for Myrinet networks and includes a driver...

Страница 90: ...clusters library csmremot html Set Up HOWTO http www 1 ibm com servers eserver clusters library csmsetup html GPFS Linux IBM General Parallel File System for Linux http www 1 ibm com servers eserver c...

Страница 91: ...d Storage Solutions ftp ftp pc ibm com pub pccbbs options 06p8884 pdf ServeRAID 4x Ultra160 SCSI Controllers Hardware Maintenance Manual ftp ftp pc ibm com pub pccbbs pc_servers 19k6408 pdf FAStT Host...

Страница 92: ...74 Installation and Service...

Страница 93: ...not mirrored a complete re install of the Management Node is required See Chapter 6 Software installation on page 35 for detailed instructions Disk drive failure on a Cluster Node The x335 supports ho...

Страница 94: ...e 35 for a listing of the software and firmware levels used in the Cluster 1350 5 Make the following configuration settings v Devices and I O Ports PORT 3F8 IRQ4 v Remote Console Redirection Enabled C...

Страница 95: ...at the PDUs in the cluster are connected to 220V source power BladeCenters connected to PDUs plugged into 115V power will not function properly Additional Information Additional hardware maintenance a...

Страница 96: ...78 Installation and Service...

Страница 97: ...sockets on the Frame Power Blocks 6 Verify voltage at the Power Out ports on the PDU using a Multimeter If no power is present replace the PDU FRU 9N9671 Otherwise continue with the next step 7 Swap...

Страница 98: ...80 Installation and Service...

Страница 99: ...and rails into the cabinet To install a replacement console switch proceed as follows 1 Select the location of an added console switch according to the following rules v If a second 1 GB Ethernet Swit...

Страница 100: ...nuts on the vertical cabinet rails Install four clip nuts in front and four in back as shown in the figure below 77193 Left Rail Right Rail IBM NetBAY 2x8 console switch Screws Screws Cable Managemen...

Страница 101: ...ghboring mounting screws of components already installed loosen these mounting screws then tighten once all of the component rails are installed e At the front of the cabinet place the cover brackets...

Страница 102: ...using a BootP address configure your BootP server to provide an IP address to the console switch and skip the next four steps 8 At the Terminal Applications menu select option 3 and specify the IP ad...

Страница 103: ...assign the IP address for the console switch a In the terminal emulation window enter 1 to select Network Configuration b Compare the IP address shown for the console switch to the IP address of the T...

Страница 104: ...86 Installation and Service...

Страница 105: ...y 2 Press F2 The Advanced menu window appears The highlight is in the Commands menu 3 Using the Up and Down arrow keys move the highlight to Snapshot and press Enter The device settings are now saved...

Страница 106: ...y selecting Advanced Menus Setup Security You must always provide a password to access the fields on the screen The default password is oscar You can change passwords set wait time for locking to take...

Страница 107: ...hree screws that secure the port server 2 Slide the port server out of the tray 3 Record the MAC address from the back of the port server Install the port server and rails 1 Remove all four rubber fee...

Страница 108: ...nfigure the device 1 Connect a laptop computer running a terminal emulation program such as HyperTerminal to the command port on the back panel of the port server using a DB9 to RJ45 Serial cable 2 Se...

Страница 109: ...rol enable IN Reach_Priv define port 21 40 flow control enable IN Reach_Priv define port 1 20 speed 9600 IN Reach_Priv define port 21 40 speed 9600 IN Reach_Priv define port 1 20 que disable IN Reach_...

Страница 110: ...92 Installation and Service...

Страница 111: ...Slide the rails out the rear of the cabinet Remove the Cisco 24 port 10 100 Switch from the rails Unscrew the Cisco 10 100 Switch from the rails There are four holes on each side of the devices Instal...

Страница 112: ...ical cabinet rails in Slot 17 Install four clip nuts in front and four in back as shown in the figure below The clip nuts may still be on the vertical cabinet rails after the rails were removed Figure...

Страница 113: ...Figure 12 on page 94 c Insert the mounting screws in the rear vertical cabinet rails as shown in Figure 13 Insert two on each side Do not tighten the screws If you have difficulty with neighboring mou...

Страница 114: ...inet To remove the tray from the cabinet do the following 1 Remove the mounting screws from the front vertical cabinet rails and remove the cover bracket 2 Remove the mounting screws from the rear ver...

Страница 115: ...Install four clip nuts in front and four in back as shown in the figure below The clip nuts may still be on the vertical cabinet rails after the rails were removed Figure 14 Mount switch rails to the...

Страница 116: ...hown in Figure 14 on page 97 c Insert the mounting screws in the rear vertical cabinet rails as shown in Figure 15 Insert two screws on each side Do not tighten the screws If you have difficulty with...

Страница 117: ...ation window enter enable This will put you in administrative mode 5 At the prompt type ibm and hit enter The prompt will change from a to a to indicate you are in administrative mode 6 Entershow run...

Страница 118: ...ommand ipconfig v On the switch use the command show running Additional information Catalyst 5000 Family Ethernet and Fast Ethernet Switching Modules Installation and Configuration Note including Tran...

Страница 119: ...he rails out the rear of the cabinet Remove the Cisco Gigabit Switch from the rails Unscrew the Cisco Gigabit Switch from the rails There are four holes on each side of the devices Install the Cisco G...

Страница 120: ...Install clip nuts on the vertical cabinet rails in Slot 20 Install four clip nuts in front and four in back as shown in the figure below The clip nuts may still be on the vertical cabinet rails after...

Страница 121: ...on page 102 c Insert the mounting screws in the rear vertical cabinet rails as shown in Figure 17 Insert two on each side Do not tighten the screws If you have difficulty with neighboring mounting sc...

Страница 122: ...is will put you in administrative mode 5 At the prompt enter ibm and hit enter The prompt will change from a to a to indicate you are in administrative mode 6 Enter show run to show the current config...

Страница 123: ...e1 It should fail Additional information Catalyst 5000 Family Ethernet and Fast Ethernet Switching Modules Installation and Configuration Note including Translated Safety warnings 10 languages http ww...

Страница 124: ...106 Installation and Service...

Страница 125: ...mal duct and how it fits within the cabinet and attaches to the switch Item Part No Qty Description 1 24P7877 2 Bracket Cisco 2 24P7878 1 Rail right 3 24P7879 1 Cover 4 24P7885 1 Rail duct 5 1410 42L...

Страница 126: ...108 Installation and Service...

Страница 127: ...he connections to the Storage and Cluster Nodes The line cards plug into slots in the Switch chassis Management Module Manages and routes the Myrinet traffic polling the ports and building tables to c...

Страница 128: ...assis and fasten the rack mount screws 7 Connect the optical cables to the connectors on the Switch Save the dust caps for future use 8 Connect the power cord to the Myrinet Switch This powers up the...

Страница 129: ...the Power Management Module you must remove the tray from the cabinet Uncable the Power Management Module 1 Note the positions of all cable connections to the Power Management Module 2 Obtain the IP a...

Страница 130: ...ng screws from the rear vertical cabinet rails 5 Slide the tray out the rear of the cabinet Remove the Power Management Module from the tray 1 Unplug the power cables from the power bricks that lie on...

Страница 131: ...side holes on each side of the Power Management Module align with the two outer most holes on each side of the tray as shown in Figure 20 b Insert two screws on each side of the tray in the two outerm...

Страница 132: ...y in from the rear of the cabinet b Tighten one screw on each side of the sliding bracket to prevent the bracket from extending as you slide the tray in the cabinet c Install the clip nuts on the cabi...

Страница 133: ...es and the cable to the PDU out through the cable management slot in the tray If the tray catches as you are sliding it into the cabinet push up on the tray from underneath b Insert the mounting screw...

Страница 134: ...sliding brackets so that the holes line up with the front vertical cabinet rails as shown in the figure below Insert the mounting screws in the front vertical cabinet rails e Tighten the mounting scre...

Страница 135: ...Module Configure and setup after device replacement 1 Configure the new Power Management Module with the same IP address of the Power Management Module you removed 2 Verify that the firmware level is...

Страница 136: ...fm The online search engine for APC documentation is available at http sturgeon apcc com techref nsf umanuals openform Use AP 9212 as a search parameter Relevant documents include v MasterSwitch Power...

Страница 137: ...t and up to twelve rack PDUs To remove the Power Distribution Units take the following steps 1 Shut down all devices 2 Remove the side cover on the side of the rack that the failing PDU is located on...

Страница 138: ...120 Installation and Service...

Страница 139: ...Part 4 Appendixes Copyright IBM Corp 2003 121...

Страница 140: ...122 Installation and Service...

Страница 141: ...get the no hard drive found message from Linux when installing an x335 with IDE drives A The file csminstall csm 1 3 0 kickstart RedHat7 3 172 20 3 x kickstart needs to be changed where x is the IP ad...

Страница 142: ...he install still cycles then edit the csminstall Linux SIS scripts hostname sh file and comment out the shutdown line near the bottom of the file Now using the console watch the boot and the error mes...

Страница 143: ...tic portion of the bootup Press F2 to run diagnostics then F3 to view log file POST BIOS errors can be read by pressing F1 key during boot process and then selecting View Error Logs from menu This giv...

Страница 144: ...126 Installation and Service...

Страница 145: ...S mounts Existing NFS mounted file systems are inaccessible after a CSM installation on a cluster node 1 Remount the NFS file systems 2 If there is an existing tftpboot partition on cluster nodes an e...

Страница 146: ...ohci alias scsi_hostadapter4 aic7xxx Edited modules conf alias eth0 e1000 alias scsi_hostadapter aic7xxx alias scsi_hostadapter1 ips alias eth1 e1000 alias eth1 e1000 alias parport_lowlevel parport_p...

Страница 147: ...hen assigning names of the RSA and Service Processor If a name is not recognized verify that there are no trailing blanks after the name Light path points to PCI LED If Light Path diagnostics points t...

Страница 148: ...130 Installation and Service...

Страница 149: ...to the Management VLAN Again one port assigned to the Management VLAN needs to be reserved to make the connection to the switch itself It is the same story as above for the management port on the SUP...

Страница 150: ...er debug commands To see spanning tree info on a port by port basis issue the following command show spanning tree brief Switch commands for 4006 running IOS These commands will work with 3550 running...

Страница 151: ...es issue the following commands conf t int range mode port port switchport host end To see the VLAN setup issue the following command show vlan To set the switch as the spanning tree root Run the comm...

Страница 152: ...n ports going to compute and storage nodes issue the following commands set port host To see the VLAN setup issue the following command show vlan To set the switch as the spanning tree primary set spa...

Страница 153: ...Miscellaneous CISCO switch commands for IOS To see what ports are blocked by the spanning tree issue the following command show sp br Appendix D Setting up network switches 135...

Страница 154: ...136 Installation and Service...

Страница 155: ...e license to use the Program You may 1 use the Program to the extent of authorizations you have acquired and 2 make and install copies to support the level of use authorized providing you reproduce th...

Страница 156: ...ES INCLUDING WITHOUT LIMITATION LOST PROFITS LOST SAVINGS OR ANY INCIDENTAL SPECIAL OR OTHER ECONOMIC CONSEQUENTIAL DAMAGES EVEN IF IBM IS INFORMED OF THEIR POSSIBILITY SOME JURISDICTIONS DO NOT ALLOW...

Страница 157: ...used according to the Program information You have to check the usability according to the Program information within the money back guaranty period Limitation of Liability Section 5 The following par...

Страница 158: ...ftware in the operation of a Cisco networking product only b make not more than one 1 copy of the Cisco Software which you may use only for purposes of backup and disaster recovery You may not otherwi...

Страница 159: ...the Cisco Software you may only use such upgrades if at the time you receive them you have a valid license to use the Cisco Software which was upgraded or updated Appendix E International License Agr...

Страница 160: ...142 Installation and Service...

Страница 161: ...e following paragraph does not apply to the United Kingdom or any other country where such provisions are inconsistent with local law INTERNATIONAL BUSINESS MACHINES CORPORATION PROVIDES THIS PUBLICAT...

Страница 162: ...ions to this equipment Unauthorized changes or modifications could void the user s authority to operate the equipment This device complies with Part 15 of the FCC Rules Operation is subject to the fol...

Страница 163: ...55022 The limits for Class A equipment were derived for commercial and industrial environments to provide reasonable protection against interference with licensed communication equipment Attention Th...

Страница 164: ...nt of Health and Human Services DHHS regulation 21 CFR Subchapter J This compliance is indicated by markings on the laser component assembly Note that the Class 1 conformity label may not be visible w...

Страница 165: ...improve the environmental quality of OEM products but at this time environmental achievements cannot be assumed for all OEM devices Energy Savings Four processor boards do the work of several of the f...

Страница 166: ...used with the exception of static bags v The sum concentration of incidental levels of lead cadmium mercury and hexavalent chromium is less than 0 01 by weight v Inks are water based with no heavy met...

Страница 167: ...installing on management node 46 known problems 127 pre installation tasks 44 problem determination 70 CSM Cluster Systems Management 44 D defective cable replacing 29 determining problems 59 Distribu...

Страница 168: ...9 R RCM cabling 29 Red Hat Linux Storage Node configuration 46 remote access 53 remote console 53 remote power 53 Remote Console Manager cabling 29 removal Cisco 4000 Series switch 107 Power Distribut...

Страница 169: ......

Страница 170: ...IBMR Printed in U S A...

Отзывы: