Connecting External Options
What to do next?
If you installed options during the initial setup of your server,
go to “Installation Checklist” on page 27 to complete the
installation procedure; then, return here.
If you installed hot-swap drives, you might need to update your
server configuration parameters.
Go to Chapter 2, “Configuring Your Server” on page 29 to see
if you need to configure your server.
Note: If your server has a RAID adapter installed, refer to the
RAID adapter documentation to see if you need to
update your RAID configuration information; then, go to
Chapter 2, “Configuring Your Server” on page 29 for
additional details about configuration.
If you removed modules or internal drives, you must run the
Setup program. See Chapter 2, “Configuring Your Server” on
page 29 for instructions.
If you installed or removed an ISA or EISA adapter, you must
run the System Configuration Utility program. See Chapter 2,
“Configuring Your Server” on page 29 for instructions.
Device drivers to install? (The instructions that come with the
option will tell you if device drivers are required and how to
install them.) If you do not need to install any device drivers or
configure the system, your server is ready to use.
Chapter 3. Installing Options
207
Содержание PC Server 704
Страница 1: ...PC Server 704 User s Handbook IBM...
Страница 332: ...IBM Part Number 30F6951 Printed in U S A March 1997 3 F6951...