Chapter 5. Configuration tools and rules
117
Figure 5-6 LPAR Validation Tool - slot assignments
From this window a detailed report is available, and a validation engine can be
selected to point out any errors in the configuration. If changes to the memory
configuration are required, you can edit the configuration and change the values
in error. When the configuration has been validated without error, you can feel
confident that the resources selected will provide the configuration desired. At
this point, if you choose, you can configure the system in an ordering tool, or
MES upgrade an existing machine with the additional resources required to
handle a new LPAR configuration.
5.2 Configuration rules for p5-590 and p5-595
In order to properly configure a p5-590 or p5-595, a minimum set of requirements
and constraints must be satisfied. The purpose of this section is to explain those
requirements and identify components that are needed to establish the base
(minimum) platform configuration.
Besides the accuracy of the configuration, it is also important to configure the
system that best meets the needs of the application. Individual system
application requirements such as availability, performance, or flexibility, may
require additional components or devices to produce an optimal system
configuration.
Содержание p5 590
Страница 2: ......
Страница 16: ...xiv IBM Eserver p5 590 and 595 System Handbook...
Страница 38: ...16 IBM Eserver p5 590 and 595 System Handbook...
Страница 106: ...84 IBM Eserver p5 590 and 595 System Handbook...
Страница 132: ...110 IBM Eserver p5 590 and 595 System Handbook...
Страница 160: ...138 IBM Eserver p5 590 and 595 System Handbook...
Страница 215: ...Chapter 7 Service processor 193 Figure 7 21 Current boot sequence menu default boot list...
Страница 216: ...194 IBM Eserver p5 590 and 595 System Handbook...
Страница 258: ...236 IBM Eserver p5 590 and 595 System Handbook Figure 8 34 Inventory Scout Figure 8 35 Select server to get VPD data...
Страница 264: ...242 IBM Eserver p5 590 and 595 System Handbook Figure 8 40 Detail view of a service event...
Страница 280: ...258 IBM Eserver p5 590 and 595 System Handbook...
Страница 285: ...Appendix C Installation planning 263 Figure C 1 Search for planning Figure C 2 Select 9119 590 and 9119 595...
Страница 286: ...264 IBM Eserver p5 590 and 595 System Handbook Figure C 3 Planning information...
Страница 298: ...276 IBM Eserver p5 590 and 595 System Handbook...
Страница 302: ...280 IBM Eserver p5 590 and 595 System Handbook...
Страница 312: ...290 IBM Eserver p5 590 and 595 System Handbook...
Страница 313: ...0 5 spine 0 475 0 875 250 459 pages IBM Eserver p5 590 and 595 System Handbook...
Страница 314: ......
Страница 315: ......