Index
285
FC 6201 133
FC 6203 246
FC 6204 246, 257
FC 6230 246, 256
FC 6231 256
FC 6235 256
FC 6239 246
FC 6240 133
FC 6251 119–120
FC 6252 119–120
FC 6256 252
FC 6312 246
FC 6563 253
FC 6571 127, 253
FC 7133 252
FC 7204 252
FC 7205 252
FC 7206 252
FC 7207 252
FC 7208 252
FC 7212 252
FC 7332 252
FC 7803 119, 121, 132
FC 7807 120, 131
FC 7809 118, 120, 131
FC 7810 118, 120
FC 7811 119–120
FC 7812 119–120, 122
FC 7813 119–120, 131
FC 7814 124
FC 7815 120
FC 7816 124
FC 7818 119–120
FC 7821 118, 120, 131
FC 7822 118, 120, 131
FC 7823 131
FC 7824 131
FC 7825 131
FC 7826 120, 131
FC 7828 124
FC 7829 124
FC 7835 124
FC 7837 119, 121, 132–133
FC 7924 119–120
FC 7925 118
FC 7981 118
FC 7988 119, 131
FC 7990 120
FC 8195 124
FC 8197 124
FC 8198 124
FC 8398 246
FC 8691 131–133
Field Replaceable Unit 155
field replaceable unit (FRU) 144
firewall 209, 220
firmware 149, 170
binary image 36, 170
update 36
description of 186
update policy 184
First Failure Data Capture, FFDC 143
flash memory 36
FPR
Floating Point registers 20
frame 4
FRU 155
fsck 243
G
gateway 209
general overview of p5-590 and p5-595 4
GPR 20
guided setup wizard 209
GX+ adapter 31
H
half-drawer 41
hardware architecture 17
Hardware Information Center 46, 172, 208, 266
Hardware Management Console (HMC) 31, 36,
158, 196, 198
apply/activate command 171
CoD activation code 93
CoD activation code failures 93
desktop HMC, feature code FC 7310-C04 134
install/activate command 171
launch ASMI menu 176
partition power-on properties 189
partition profile 189
rack-mount HMC, feature code FC 7310-CR3
134
service focal point 175
service utilities 176
Hardware Page Table(HPT) 125
HB 52, 257
high availability 23
Содержание p5 590
Страница 2: ......
Страница 16: ...xiv IBM Eserver p5 590 and 595 System Handbook...
Страница 38: ...16 IBM Eserver p5 590 and 595 System Handbook...
Страница 106: ...84 IBM Eserver p5 590 and 595 System Handbook...
Страница 132: ...110 IBM Eserver p5 590 and 595 System Handbook...
Страница 160: ...138 IBM Eserver p5 590 and 595 System Handbook...
Страница 215: ...Chapter 7 Service processor 193 Figure 7 21 Current boot sequence menu default boot list...
Страница 216: ...194 IBM Eserver p5 590 and 595 System Handbook...
Страница 258: ...236 IBM Eserver p5 590 and 595 System Handbook Figure 8 34 Inventory Scout Figure 8 35 Select server to get VPD data...
Страница 264: ...242 IBM Eserver p5 590 and 595 System Handbook Figure 8 40 Detail view of a service event...
Страница 280: ...258 IBM Eserver p5 590 and 595 System Handbook...
Страница 285: ...Appendix C Installation planning 263 Figure C 1 Search for planning Figure C 2 Select 9119 590 and 9119 595...
Страница 286: ...264 IBM Eserver p5 590 and 595 System Handbook Figure C 3 Planning information...
Страница 298: ...276 IBM Eserver p5 590 and 595 System Handbook...
Страница 302: ...280 IBM Eserver p5 590 and 595 System Handbook...
Страница 312: ...290 IBM Eserver p5 590 and 595 System Handbook...
Страница 313: ...0 5 spine 0 475 0 875 250 459 pages IBM Eserver p5 590 and 595 System Handbook...
Страница 314: ......
Страница 315: ......