Chapter 4. Capacity on Demand
103
Figure 4-10 CoD Processor Capacity Settings “Trial CoD” HMC window
4.8.1 HMC command line functions
In addition to the GUI interface to Capacity on Demand functions on the
Hardware Management Console, command line functions are available for most
actions. See the HMC documentation regarding use of remote command line
functions.
4.9 Capacity on Demand configuration rules
All p5-590 and p5-595 multichip module processor books are initially
implemented as 16-way CUoD offerings with zero active processors. All
Sserver
p5 platforms are shipped with a CUoD anchor card. This card stores
information regarding system CoD, including the activation entitlements (once
entered) and data regarding capacity usage.
4.9.1 Processor Capacity Upgrade on Demand configuration rules
As previously mentioned, all processor books available on the p5-590 and p595
are initially implemented as 16-way CUoD offerings with zero active processors.
A minimum of eight permanently activated processors are required on the
Содержание p5 590
Страница 2: ......
Страница 16: ...xiv IBM Eserver p5 590 and 595 System Handbook...
Страница 38: ...16 IBM Eserver p5 590 and 595 System Handbook...
Страница 106: ...84 IBM Eserver p5 590 and 595 System Handbook...
Страница 132: ...110 IBM Eserver p5 590 and 595 System Handbook...
Страница 160: ...138 IBM Eserver p5 590 and 595 System Handbook...
Страница 215: ...Chapter 7 Service processor 193 Figure 7 21 Current boot sequence menu default boot list...
Страница 216: ...194 IBM Eserver p5 590 and 595 System Handbook...
Страница 258: ...236 IBM Eserver p5 590 and 595 System Handbook Figure 8 34 Inventory Scout Figure 8 35 Select server to get VPD data...
Страница 264: ...242 IBM Eserver p5 590 and 595 System Handbook Figure 8 40 Detail view of a service event...
Страница 280: ...258 IBM Eserver p5 590 and 595 System Handbook...
Страница 285: ...Appendix C Installation planning 263 Figure C 1 Search for planning Figure C 2 Select 9119 590 and 9119 595...
Страница 286: ...264 IBM Eserver p5 590 and 595 System Handbook Figure C 3 Planning information...
Страница 298: ...276 IBM Eserver p5 590 and 595 System Handbook...
Страница 302: ...280 IBM Eserver p5 590 and 595 System Handbook...
Страница 312: ...290 IBM Eserver p5 590 and 595 System Handbook...
Страница 313: ...0 5 spine 0 475 0 875 250 459 pages IBM Eserver p5 590 and 595 System Handbook...
Страница 314: ......
Страница 315: ......