60
IBM
Eserver
p5 590 and 595 System Handbook
Figure 3-1 POWER5 partitioning concept
Micro-Partitioning is supported across the entire POWER5 product line from the
entry to the high-end systems. Table 3-1 provides the maximum number of
logical partitions and shared processor partition the different models.
Table 3-1 Micro-Partitioning overview on p5 systems
It is important to point out that the maximums stated are supported by the
hardware, but the practical limits based on production workload demands may be
significantly lower.
The shared processor partitions are created and managed by the HMC. When
you start creating a partition you have to choose between a shared processor
partition and a dedicated processor partition.
Sserver
p5 servers
Model
510
Model
520
Model
550
Model
570
Model
575
Model
590
Model
595
Processors
2
2
4
16
8
32
64
Dedicated
processor partitions
2
2
4
16
8
32
64
Shared processor
partitions
20
20
40
160
80
254
254
Virtual I/O
Server
Virtual
adapter
Virtual
SCSI
Linux
AIX
v5.2
AIX
v5.3
AI
X v5.
3
AI
X v5.
3
LinuxLinux
AI
X v
5.
3
AI
X v
5.
3
LinuxLinux
AI
X v
5.
3
AI
X v
5.
3
POWER Hypervisor
Virtual Ethernet
I/O
Storage Network
I/O
Sto Net
I/O
Sto Net
I/O
Sto Net
HMC
2 CPUs
2 CPUs 3 CPUs 3 CPUs
6 CPUs
I/O
S N
Network
External
storage
Micro-Partitioning
POWER5 Partitioning
Содержание p5 590
Страница 2: ......
Страница 16: ...xiv IBM Eserver p5 590 and 595 System Handbook...
Страница 38: ...16 IBM Eserver p5 590 and 595 System Handbook...
Страница 106: ...84 IBM Eserver p5 590 and 595 System Handbook...
Страница 132: ...110 IBM Eserver p5 590 and 595 System Handbook...
Страница 160: ...138 IBM Eserver p5 590 and 595 System Handbook...
Страница 215: ...Chapter 7 Service processor 193 Figure 7 21 Current boot sequence menu default boot list...
Страница 216: ...194 IBM Eserver p5 590 and 595 System Handbook...
Страница 258: ...236 IBM Eserver p5 590 and 595 System Handbook Figure 8 34 Inventory Scout Figure 8 35 Select server to get VPD data...
Страница 264: ...242 IBM Eserver p5 590 and 595 System Handbook Figure 8 40 Detail view of a service event...
Страница 280: ...258 IBM Eserver p5 590 and 595 System Handbook...
Страница 285: ...Appendix C Installation planning 263 Figure C 1 Search for planning Figure C 2 Select 9119 590 and 9119 595...
Страница 286: ...264 IBM Eserver p5 590 and 595 System Handbook Figure C 3 Planning information...
Страница 298: ...276 IBM Eserver p5 590 and 595 System Handbook...
Страница 302: ...280 IBM Eserver p5 590 and 595 System Handbook...
Страница 312: ...290 IBM Eserver p5 590 and 595 System Handbook...
Страница 313: ...0 5 spine 0 475 0 875 250 459 pages IBM Eserver p5 590 and 595 System Handbook...
Страница 314: ......
Страница 315: ......