Chapter 6. Installing options
89
Installing a hot-swap power supply
Before you continue with the power supply-installation procedure, review the
following.
Notes:
1. During normal operation, each power supply bay must have either a power
supply or filler panel installed for proper cooling.
2. If you have a rack model, before you install a power supply in the right-most
power supply bay, you must disconnect the cable-management arm. You can
connect the cable-management arm after installing the power supply.
Statement 8
CAUTION:
Never remove the cover on a power supply or any part that has the following label
attached.
Hazardous voltage, current, and energy levels are present inside any component
that has this label attached. There are no serviceable parts inside these components.
If you suspect a problem with one of these parts, contact a service technician.
Содержание Netfinity 7100
Страница 1: ...IBM IBM Netfinity 7100 User s Reference SC19 K081 10 ...
Страница 2: ......
Страница 3: ...IBM IBM Netfinity 7100 User s Reference SC19 K081 10 ...
Страница 7: ...Contents v Index 183 ...
Страница 8: ...vi IBM Netfinity 7100 User s Reference ...
Страница 13: ...xi Statement 4 18 kg 37 lbs 32 kg 70 5 lbs 55 kg 121 2 lbs CAUTION Use safe practices when lifting ...
Страница 34: ...20 IBM Netfinity 7100 User s Reference ...
Страница 72: ...58 IBM Netfinity 7100 User s Reference ...
Страница 174: ...160 IBM Netfinity 7100 User s Reference ...
Страница 196: ...182 IBM Netfinity 7100 User s Reference ...
Страница 199: ......